Line |
Item Number |
Description |
Units |
Quantity |
065-602-022 - 065-602-022 Non-Participating |
|
2104.503/00265 |
REMOVE METAL CULVERT |
L F |
176 |
|
2104.504/00120 |
REMOVE BITUMINOUS PAVEMENT |
S Y |
320 |
|
2211.509/00070 |
AGGREGATE BASE CLASS 5 |
TON |
315 |
|
2442.501/00010 |
REMOVE EXISTING BRIDGE |
LS |
1 |
|
2451.507/00060 |
GRANULAR BACKFILL (LV) |
C Y |
365 |
|
2501.502/36015 |
15" CS SAFETY APRON |
EACH |
2 |
|
2501.502/36018 |
18" CS SAFETY APRON |
EACH |
2 |
|
2501.503/12015 |
15" CS PIPE CULVERT |
L F |
140 |
|
2501.503/12018 |
18" CS PIPE CULVERT |
L F |
140 |
|
2573.503/00023 |
SILT FENCE; TYPE MS |
L F |
100 |
|
2573.503/00060 |
SEDIMENT CONTROL LOG TYPE STRAW |
L F |
40 |
|
2575.504/00110 |
RAPID STABILIZATION METHOD 4 |
S Y |
1,750 |
065-602-022 - 065-602-022 Participating |
|
2021.501/00010 |
MOBILIZATION |
LS |
1 |
|
2412.502/12100 |
12X10 PRECAST CONCRETE BOX CULV END SECT |
EACH |
4 |
|
2412.503/12100 |
12X10 PRECAST CONCRETE BOX CULVERT |
L F |
172 |
|
2451.507/00060 |
GRANULAR BACKFILL (LV) |
C Y |
467 |
|
2451.609/00050 |
PIPE BEDDING MATERIAL |
TON |
530 |
|
2511.509/00013 |
RANDOM RIPRAP CLASS III |
TON |
250 |
|
2520.507/00010 |
LEAN MIX BACKFILL |
C Y |
59 |
|
2563.601/00010 |
TRAFFIC CONTROL |
LS |
1 |
065-608-014 - 065-608-014 Non-Participating |
|
2104.503/00205 |
SAWING BIT PAVEMENT (FULL DEPTH) |
L F |
50 |
|
2104.503/00255 |
REMOVE PIPE CULVERTS |
L F |
63 |
|
2104.504/00120 |
REMOVE BITUMINOUS PAVEMENT |
S Y |
1,120 |
|
2211.509/00070 |
AGGREGATE BASE CLASS 5 |
TON |
1,280 |
|
2442.501/00010 |
REMOVE EXISTING BRIDGE |
LS |
1 |
|
2451.507/00060 |
GRANULAR BACKFILL (LV) |
C Y |
710 |
|
2501.502/36015 |
15" CS SAFETY APRON |
EACH |
1 |
|
2501.503/12015 |
15" CS PIPE CULVERT |
L F |
70 |
|
2573.501/00025 |
STABILIZED CONSTRUCTION EXIT |
LS |
1 |
|
2573.502/00110 |
STORM DRAIN INLET PROTECTION |
EACH |
2 |
|
2573.503/00054 |
FILTER BERM TYPE 5 |
L F |
90 |
|
2573.503/00060 |
SEDIMENT CONTROL LOG TYPE STRAW |
L F |
550 |
|
2575.504/00110 |
RAPID STABILIZATION METHOD 4 |
S Y |
2,700 |
065-608-014 - 065-608-014 Participating |
|
2021.501/00010 |
MOBILIZATION |
LS |
1 |
|
2412.502/14120 |
14X12 PRECAST CONCRETE BOX CULV END SECT |
EACH |
6 |
|
2412.503/14120 |
14X12 PRECAST CONCRETE BOX CULVERT |
L F |
246 |
|
2451.507/00060 |
GRANULAR BACKFILL (LV) |
C Y |
640 |
|
2451.609/00050 |
PIPE BEDDING MATERIAL |
TON |
815 |
|
2511.509/00013 |
RANDOM RIPRAP CLASS III |
TON |
500 |
|
2520.507/00010 |
LEAN MIX BACKFILL |
C Y |
60 |
|
2563.601/00010 |
TRAFFIC CONTROL |
LS |
1 |
CP 2021-06 - CP 2021-06 |
|
2021.501/00010 |
MOBILIZATION |
LS |
1 |
|
2104.503/00255 |
REMOVE PIPE CULVERTS |
L F |
168 |
|
2104.504/00120 |
REMOVE BITUMINOUS PAVEMENT |
S Y |
575 |
|
2411.507/04040 |
GRANULAR BACKFILL (LV) |
C Y |
560 |
|
2451.609/00050 |
PIPE BEDDING MATERIAL |
TON |
144 |
|
2501.502/05054 |
54" RC PIPE APRON |
EACH |
2 |
|
2501.502/36015 |
15" CS SAFETY APRON |
EACH |
2 |
|
2501.503/12015 |
15" CS PIPE CULVERT |
L F |
160 |
|
2501.503/13543 |
54" RC PIPE CULVERT CLASS III |
L F |
96 |
|
2511.509/00013 |
RANDOM RIPRAP CLASS III |
TON |
150 |
|
2563.601/00010 |
TRAFFIC CONTROL |
LS |
1 |
|
2575.504/00110 |
RAPID STABILIZATION METHOD 4 |
S Y |
1,000 |