Project Items
Line | Item Number | Description | Units | Quantity |
---|---|---|---|---|
017-598-007 - Non-Participating | ||||
5 | 2442.501/00010 | REMOVE EXISTING BRIDGE | LS | 1 |
9 | 2575.504/00110 | RAPID STABILIZATION METHOD 4 | S Y | 3,500 |
10 | 2101.501/00020 | CLEARING & GRUBBING | LS | 1 |
11 | 2104.503/00255 | REMOVE PIPE CULVERTS | L F | 30 |
13 | 2501.502/04024 | 24" GS PIPE APRON | EACH | 1 |
14 | 2501.503/12024 | 24" CS PIPE CULVERT | L F | 50 |
017-598-007 - Participating | ||||
1 | 2021.501/00010 | MOBILIZATION | LS | 1 |
3 | 2412.502/14070 | 14X7 PRECAST CONCRETE BOX CULV END SECT | EACH | 2 |
4 | 2412.503/14070 | 14X7 PRECAST CONCRETE BOX CULVERT | L F | 50 |
6 | 2451.507/00035 | STRUCTURE EXCAVATION CLASS U (P) | C Y | 744 |
7 | 2451.607/0001 | 1 1/2" CRUSHED ROCK BEDDING (CV) (P) | CY | 118 |
8 | 2511.509/00013 | RANDOM RIPRAP CLASS III | TON | 200 |
12 | 2106.507/00130 | COMMON EMBANKMENT (CV) | C Y | 706 |
SAP 017-598-008 - Non-Participating | ||||
5 | 2442.501 | REMOVE EXISTING BRIDGE | LS | 1 |
9 | 2575.504/00110 | RAPID STABILIZATION METHOD 4 | S Y | 689 |
SAP 017-598-008 - Participating | ||||
1 | 2021.501 | MOBILIZATION | LS | 1 |
2 | 2106.507 | COMMON EMBANKMENT (CV) | C Y | 1,880 |
3 | 2412.502/14070 | 14X7 PRECAST CONCRETE BOX CULV END SECT | EACH | 2 |
4 | 2412.503/14070 | 14X7 PRECAST CONCRETE BOX CULVERT | L F | 88 |
6 | 2451.507/00035 | STRUCTURE EXCAVATION CLASS U (P) | C Y | 2,561 |
7 | 2451.607/0001 | 1 1/2" CRUSHED ROCK BEDDING (CV) (P) | CY | 172 |
8 | 2511.509/00014 | RANDOM RIPRAP CLASS IV | TON | 119 |