Line | Item Number | Description | Units | Quantity |
---|---|---|---|---|
1 | 2021.501/00010 | MOBILIZATION | LS | 1 |
2 | 2104.503/00195 | SAWING CONCRETE PAVEMENT (FULL DEPTH) | L F | 142 |
3 | 2104.503/00315 | REMOVE CURB & GUTTER | L F | 138 |
4 | 2104.504/00120 | REMOVE BITUMINOUS PAVEMENT | S Y | 317 |
5 | 2104.504/00090 | REMOVE CONCRETE PAVEMENT | S Y | 71 |
6 | 2104.518/00080 | REMOVE SIDEWALK | S F | 2,034 |
7 | 2105.507/00015 | COMMON EXCAVATION (P) | C Y | 91 |
8 | 2360.503 | BITUMINOUS PAVEMENT PATCH | SQ.YD. | 115 |
9 | 2504.602/00032 | ADJUST GATE VALVE & BOX | EACH | 1 |
10 | 2521.518/00040 | 4" CONCRETE WALK | S F | 6,128 |
11 | 2521.518/00060 | 6" CONCRETE WALK | S F | 861 |
12 | 2531.503/02315 | CONCRETE CURB & GUTTER DESIGN B618 | L F | 413 |
13 | 2531.503/02320 | CONCRETE CURB & GUTTER DESIGN B624 | L F | 25 |
14 | 2531.504/00060 | 6" CONCRETE DRIVEWAY PAVEMENT | S Y | 71 |
15 | 2531.618/00010 | TRUNCATED DOMES | S F | 168 |
16 | 2563.601/00010 | TRAFFIC CONTROL | LS | 1 |
17 | 2565.616 | PEDESTRIAN CROSSWALK FLASHER SYSTEM (RRFB) - SYSTEM A | SYSTEM | 1 |
18 | 2565.616 | PEDESTRIAN CROSSWALK FLASHER SYSTEM (RRFB) - SYSTEM B | SYSTEM | 3 |
19 | 2565.616 | SPEED LIMIT FLASHER SYSTEM (DSD) | SYSTEM | 4 |
20 | 2573.502/00110 | STORM DRAIN INLET PROTECTION | EACH | 6 |
21 | 2574.507/00104 | BOULEVARD TOPSOIL BORROW | C Y | 31 |
22 | 2575.602/00700 | SITE RESTORATION | EACH | 3 |