Line |
Item Number |
Description |
Units |
Quantity |
1 |
1 |
MOBILIZATION AND DEMOBILIZATION |
LUMP SUM |
1 |
2 |
2 |
FURNISH AND INSTALL BIOROLL |
LINEAR FOOT |
180 |
4 |
4 |
CELL IV AND CELL V LINER EXPOSURE FOR TIE-IN |
LUMP SUM |
1 |
5 |
5 |
EXCAVATE CELL VI TO SUBGRADE (P) |
CY |
8,708 |
6 |
6 |
CELL VI PERMETER BERM (P) |
CY |
3,320 |
7 |
7 |
FURNISH AND INSTALL 3' CLAY LINER |
CY |
5,890 |
8 |
8 |
FURNISH AND INSTALL 60 MIL HDPE SMOOTH GEOMEMBRANE (P) |
SF |
35,236 |
9 |
9 |
FURNISH AND INSTALL 60 MIL HDPE TEXTURED (BOTH SIDES) GEOMEMBRANE (P) |
SF |
10,505 |
10 |
10 |
FURNISH AND INSTALL 12" DRAINAGE SAND (P) |
CY |
1,860 |
11 |
11 |
FURNISH AND INSTALL 6" DIA. SDR 17 HDPE LEACHATE COLLECTION PIPE (PERFORATED) |
LINEAR FOOT |
215 |
12 |
12 |
FURNISH AND INSTALL 6" DIA. SDR 17 HDPE LEACHATE COLLECTION PIPE (SOLID) W/CAP |
LF |
35 |
13 |
13 |
FURNISH AND INSTALL 3/4" DIA. WASHED STONE FOR LEACHATE COLLECTION TRENCH (P) |
CY |
46 |
14 |
14 |
FURNISH AND INSTALL PEA GRAVEL FOR LEACHATE COLLECTION TRENCH (P) |
CY |
99 |
15 |
15 |
FURNISH AND INSTALL 12 OZ. GEOTEXTILE CUSHION FOR LEACHATE COLLECTION TRENCH (P) |
LF |
230 |
16 |
16 |
CELL ACCESS ROAD AND CULVERT INSTALLATION |
LUMP SUM |
1 |
17 |
17 |
FURNISH AND INSTALL 6" TOPSOIL (P) |
CY |
726 |
18 |
18 |
TURF ESTABLISHMENT (P) |
AC |
0.9 |
19 |
19 |
SITE SURVEY ESTABLISHMENT AND DOCUMENTATION |
LS |
1 |
|
3 |
RELOCATION OF SHREDDED SHINGLES STOCKPILE (P) |
CY |
0 |