Line |
Item Number |
Description |
Units |
Quantity |
Base Bid |
1 GENERAL ENGINEERING (091) |
1 |
1050.000/00000 |
BASE BID |
L S |
1 |
2 |
1550.000/00100 |
TRAFFIC BEARING WATERPROOFING MEMBRANE - RE-APPLY AT HIGH PRIORITY AREAS |
S F |
6,000 |
3 |
1550.000/00110 |
TRAFFIC BEARING WATERPROOFING MEMBRANE - APPLY AT HIGH PRIORITY AREAS |
S F |
1,500 |
4 |
1550.000/00200 |
POST-TENSIONED SLAB REPAIR - PARTIAL DEPTH |
S F |
250 |
5 |
1550.000/00210 |
POST-TENSIONED SLAB REPAIR - FULL DEPTH |
S F |
70 |
6 |
1550.000/00220 |
POST-TENSIONED SLAB REPAIR - ROUT AND SEAL |
L F |
120 |
7 |
1550.000/00240 |
PRECAST DOUBLE T DAPPED STEM REPAIR - PARTIAL DEPTH |
EACH |
5 |
8 |
1550.000/00300 |
CONCRETE COLUMN REPAIR - PARTIAL DEPTH |
S F |
30 |
9 |
1550.000/00410 |
PRECAST DOUBLE T STEM REPAIR AND PARTIAL ENCASEMENT |
EACH |
5 |
10 |
1550.000/00420 |
LEDGER BEAM REPAIR - PARTIAL DEPTH |
L F |
60 |
11 |
1550.000/00430 |
COLUMN HAUNCH REPAIR - PARTIAL DEPTH |
EACH |
3 |
12 |
1550.000/00440 |
PRECAST DOUBLE T SLAB REPAIR - PARTIAL DEPTH |
S F |
10 |
13 |
1550.000/00500 |
CONCRETE BEAM REPAIR - EPOXY INJECTION |
EACH |
20 |
14 |
1550.000/00700 |
POST-TENSIONING TENDON - FULL LENGTH REPLACEMENT |
EACH |
7 |
15 |
1550.000/00900 |
SUBGRADE PIPE REPLACEMENT - EARTHWORK EXCAVATION, ASPHALT REMOVAL AND REPLACEMENT |
S F |
20 |
Alternate 1 |
3 STRUCTURAL (091) |
16 |
1550.000/01021 |
EXPANSION JOINT AND HEADER - REMOVE EXISTING AND REPLACE WITH DSM or Equiv System AT LEVEL 3 SOUTH GRID 9 |
L S |
1 |
Alternate 2 |
3 STRUCTURAL (091) |
17 |
1550.000/01031 |
CONCRETE WASH AND DSM or Equiv EXPANSION JOINT - REMOVE EXISTING JOINT AND INSTALL AT LEVEL 3 SOUTH GRID 9 |
L S |
1 |
Alternate 3 |
2 STRUCTURAL (091) |
18 |
1550.000/01000 |
JOINT SEALANT - REMOVE AND REPLACE BETWEEN LEVEL 4 PT SLAB AND STAIR TOWERS |
L F |
100 |
Alternate 4 |
2 STRUCTURAL (091) |
19 |
1550.000/01011 |
DSM or Equiv EXPANSION JOINT - INSTALL BETWEEN LEVEL 4 PT SLAB AND STAIR TOWERS |
L F |
100 |
Alternate 5 |
4 MECHANICAL (091) |
20 |
1550.000/01060 |
REPLACE ENTIRETY OF VERTICAL STORM RISERS FROM BELOW GROUND TO CAPPED CONNECTION AT ROOF LEVEL |
L S |
1 |
Alternate 6 |
4 MECHANICAL (091) |
21 |
1550.000/01070 |
PROVIDE VENTILATION TO EXTERIOR CONTROL BOOTH |
L S |
1 |
Alternate 7 |
5 ELECTRICAL (091) |
22 |
1550.000/01080 |
REPLACE ALL EXISTING CITY CONTROLLED LIGHTING TO LED: |
L S |
1 |
Alternate 8 |
5 ELECTRICAL (091) |
23 |
1550.000/01090 |
ADDITIONAL SECURITY CAMERAS PER OUR REPORT |
L S |
1 |