1 2021.501 MOBILIZATION LUMP SUM 1
2 2031.502 FIELD OFFICE EACH 1
3 2101.502 CLEARING EACH 17
4 2101.502 GRUBBING EACH 17
5 2102.503 PAVEMENT MARKING REMOVAL LIN FT 12,789
6 2102.518 PAVEMENT MARKING REMOVAL SQ FT 368
7 2103.501 BUILDING REMOVAL A LUMP SUM 1
8 2103.501 BUILDING REMOVAL B LUMP SUM 1
9 2103.501 BUILDING REMOVAL C LUMP SUM 1
10 2103.501 BUILDING REMOVAL D LUMP SUM 1
11 2103.501 BUILDING REMOVAL E LUMP SUM 1
12 2104.502 ABANDON CATCH BASIN OR MANHOLE EACH 1
13 2104.502 REMOVE CASTING EACH 26
14 2104.502 REMOVE CONCRETE STEPS EACH 1
15 2104.502 REMOVE DELINEATOR / MARKER EACH 1
16 2104.502 REMOVE MAIL BOX SUPPORT EACH 8
17 2104.502 REMOVE MANHOLE OR CATCH BASIN EACH 22
18 2104.502 REMOVE SIGN EACH 29
19 2104.502 REMOVE SIGNAL SYSTEM A EACH 1
20 2104.502 REMOVE SIGNAL SYSTEM B EACH 1
21 2104.502 SALVAGE SIGN EACH 3
22 2104.502 SALVAGE TREE GRATE EACH 6
23 2104.503 REMOVE CURB AND GUTTER LIN FT 4,240
24 2104.503 REMOVE SEWER PIPE (STORM) LIN FT 1,141
25 2104.503 SALVAGE RETAINING WALL LIN FT 25
26 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 538
27 2104.503 SAWING CONCRETE PAVEMENT (FULL DEPTH) LIN FT 544
28 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SQ YD 115
29 2104.504 REMOVE BITUMINOUS PAVEMENT SQ YD 11,266
30 2104.504 REMOVE CONCRETE DRIVEWAY PAVEMENT SQ YD 280
31 2104.504 REMOVE CONCRETE PAVEMENT SQ YD 2,046
32 2104.518 REMOVE BITUMINOUS WALK SQ FT 1,106
33 2104.518 REMOVE CONCRETE WALK SQ FT 20,308
34 2105.607 CONTAMINATED SOIL EXCAVATION CU YD 200
35 2105.607 HAULING CONTAMINATED SOIL CU YD 200
36 2105.607 STOCKPILE CONTAMINATED SOIL CU YD 200
37 2106.507 COMMON EMBANKMENT (CV) (P) CU YD 892
38 2106.507 EXCAVATION - COMMON (P) CU YD 9,380
39 2106.507 EXCAVATION - SUBGRADE (P) CU YD 9,009
40 2106.507 SELECT GRANULAR EMBANKMENT (CV) (P) CU YD 9,009
41 2118.507 AGGREGATE SURFACING (CV) CLASS 1 CU YD 3
42 2211.507 AGGREGATE BASE (CV) CLASS 5 (P) CU YD 5,806
43 2231.509 BITUMINOUS PATCHING MIXTURE TON 153
44 2301.502 DOWEL BAR EACH 1,113
45 2301.504 CONCRETE PAVEMENT 9.0" SQ YD 2,058
46 2301.508 SUPPLEMENTAL PAVEMENT REINFORCEMENT POUND 1,305
47 2301.602 DRILL AND GROUT DOWEL BAR (EPOXY COATED) EACH 147
48 2301.602 DRILL AND GROUT REINF BAR (EPOXY COATED) EACH 136
49 2360.504 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) 4.0" THICK SQ YD 75
50 2360.509 TYPE SP 12.5 NON WEARING COURSE MIXTURE (4,B) TON 1,170
51 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (4,E) TON 2,796
52 2411.502 CONCRETE STAIRWAY EACH 1
53 2502.503 4" PERF PE PIPE DRAIN LIN FT 2,560
54 2503.503 12" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT 40
55 2503.503 15" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT 899
56 2503.503 18" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT 509
57 2503.503 24" RC PIPE SEWER DESIGN 3006 CLASS III LIN FT 163
58 2503.503 30" RC PIPE SEWER DESIGN 3006 CLASS III LIN FT 195
59 2503.602 CONNECT INTO EXISTING DRAINAGE STRUCTURE EACH 2
60 2503.602 CONNECT TO EXISTING STORM SEWER EACH 4
61 2503.602 CONSTRUCT BULKHEAD EACH 4
62 2503.603 PLUG FILL AND ABANDON PIPE SEWER LIN FT 130
63 2504.602 ADJUST GATE VALVE AND BOX EACH 5
64 2504.602 ADJUST HYDRANT EACH 1
65 2506.502 ADJUST FRAME AND RING CASTING EACH 1
66 2506.502 CASTING ASSEMBLY EACH 36
67 2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 EACH 5
68 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 LIN FT 103.8
69 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020 LIN FT 47
70 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN SD-48 LIN FT 13.9
71 2506.602 ADJUST FRAME AND RING CASTING (SPECIAL) EACH 1
72 2506.602 CASTING ASSEMBLY SPECIAL EACH 3
73 2506.602 RECONSTRUCT DRAINAGE STRUCTURE SPECIAL EACH 3
74 2506.602 SEAL MANHOLE EACH 4
75 2521.518 3" BITUMINOUS WALK SQ FT 1,312
76 2521.518 6" CONCRETE WALK SQ FT 9,266
77 2521.518 6" CONCRETE WALK SPECIAL SQ FT 9,893
78 2521.602 DRILL AND GROUT REINF BAR (EPOXY COATED) EACH 298
79 2521.618 CONCRETE CURB RAMP WALK SQ FT 3,382
80 2531.503 CONCRETE CURB AND GUTTER DESIGN B424 LIN FT 36
81 2531.503 CONCRETE CURB AND GUTTER DESIGN B618 LIN FT 69
82 2531.503 CONCRETE CURB AND GUTTER DESIGN B624 LIN FT 4,783
83 2531.504 6" CONCRETE DRIVEWAY PAVEMENT SQ YD 189
84 2531.504 8" CONCRETE DRIVEWAY PAVEMENT SQ YD 88
85 2531.618 TRUNCATED DOMES SQ FT 440
86 2533.503 PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337 LIN FT 560
87 2533.503 RELOCATE PORTABLE PRECAST CONCRETE BARRIER DESIGN 8337 LIN FT 850
88 2540.602 MAIL BOX SUPPORT EACH 2
89 2540.603 INSTALL RETAINING WALL LIN FT 25
90 2563.601 ALTERNATE PEDESTRIAN ROUTE LUMP SUM 1
91 2563.601 TRAFFIC CONTROL LUMP SUM 1
92 2563.615 RELOCATE TEMPORARY IMPACT ATTENUATOR ASSEMBLY 5
93 2563.615 TEMPORARY IMPACT ATTENUATOR ASSEMBLY 2
94 2564.502 INSTALL SIGN EACH 3
95 2564.602 DELINEATOR / MARKER PANEL EACH 5
96 2564.618 SIGN SQ FT 242
97 2565.501 EMERGENCY VEHICLE PREEMPTION SYSTEM A LUMP SUM 1
98 2565.501 EMERGENCY VEHICLE PREEMPTION SYSTEM B LUMP SUM 1
99 2565.501 TRAFFIC CONTROL INTERCONNECT LUMP SUM 1
100 2565.516 TRAFFIC CONTROL SIGNAL SYSTEM A SYSTEM 1
101 2565.516 TRAFFIC CONTROL SIGNAL SYSTEM B SYSTEM 1
102 2565.616 TEMPORARY SIGNAL SYSTEM A SYSTEM 1
103 2565.616 TEMPORARY SIGNAL SYSTEM B SYSTEM 1
104 2573.501 EROSION CONTROL SUPERVISOR LUMP SUM 1
105 2573.501 STABILIZED CONSTRUCTION EXIT LUMP SUM 1
106 2573.502 STORM DRAIN INLET PROTECTION EACH 69
107 2573.503 SILT FENCE, TYPE MS LIN FT 1,845
108 2574.507 BOULEVARD TOPSOIL BORROW CU YD 90
109 2574.508 FERTILIZER TYPE 3 POUND 453
110 2575.504 SODDING TYPE LAWN SQ YD 2,433
111 2575.505 SEEDING ACRE 1
112 2575.508 HYDRAULIC STABILIZED FIBER MATRIX POUND 3,300
113 2575.508 SEED MIXTURE 25-131 POUND 220
114 2575.523 RAPID STABILIZATION METHOD 3 M GALLON 21
115 2582.503 24" SOLID LINE MULTI-COMPONENT GROUND IN (WR) LIN FT 197
116 2582.503 24" SOLID LINE PAINT (WR) LIN FT 101
117 2582.503 4" BROKEN LINE MULTI-COMPONENT GROUND IN (WR) LIN FT 406
118 2582.503 4" BROKEN LINE PREFORM TAPE GROUND IN (WR) CONTRAST LIN FT 100
119 2582.503 4" DOTTED LINE MULTI-COMPONENT GROUND IN (WR) LIN FT 45
120 2582.503 4" DOUBLE SOLID LINE MULTI-COMPONENT GROUND IN (WR) LIN FT 611
121 2582.503 4" SOLID LINE MULTI-COMPONENT GROUND IN (WR) LIN FT 1,957
122 2582.503 6" BROKEN LINE PAINT (WR) LIN FT 45
123 2582.503 6" DOUBLE SOLID LINE PAINT (WR) LIN FT 4,582
124 2582.503 6" SOLID LINE MULTI-COMPONENT GROUND IN (WR) LIN FT 3,549
125 2582.503 6" SOLID LINE PAINT (WR) LIN FT 14,461
126 2582.503 6" SOLID LINE PREFORM TAPE GROUND IN (WR) CONTRAST LIN FT 613
127 2582.518 CROSSWALK PREFORM THERMOPLASTIC GROUND IN SQ FT 2,160
128 2582.518 PAVEMENT MESSAGE PAINT SQ FT 460
129 2582.518 PAVEMENT MESSAGE PREFORM THERMOPLASTIC GROUND IN SQ FT 155
130 2582.518 PAVEMENT MESSAGE PREFORM THERMOPLASTIC GROUND IN CONTRAST SQ FT 62