Line Item Number Description Units Quantity
1 2021.501 MOBILIZATION LS 1
2 2104.502 REMOVE CONCRETE APRON EACH 2
3 2106.507 EXCAVATION - COMMON (P) C Y 467
4 2106.507 COMMON EMBANKMENT (CV) (P) C Y 1,664
5 2211.509 AGGREGATE BASE CLASS 5 TON 94
6 2501.502 12" RC PIPE APRON EACH 3
7 2503.503 12" RC PIPE SEWER DES 3006 L F 44
8 2503.503 18" RC PIPE SEWER DES 3006 L F 1,013
9 2503.503 24" RC PIPE SEWER DES 3006 L F 24
10 2503.602 CONNECT TO EXISTING STORM SEWER EACH 2
11 2506.502 CONST DRAINAGE STRUCTURE DESIGN G EACH 1
12 2506.502 CONST DRAINAGE STRUCTURE DESIGN SD-48 EACH 3
13 2506.502 CONST DRAINAGE STRUCTURE DESIGN SD-60 EACH 2
14 2506.503 CONST DRAINAGE STRUCTURE DESIGN PC-12" L F 5
15 2506.602 CONNECT TO EXISTING STRUCTURE EACH 1
16 2521.618 CONCRETE WALK S F 2,711
17 2531.618 TRUNCATED DOMES S F 30
18 2545.501 LIGHTING SYSTEM LS 1
19 2563.601 TRAFFIC CONTROL LUMP SUM 1
20 2573.501 EROSION CONTROL SUPERVISOR LS 1
21 2573.502 STORM DRAIN INLET PROTECTION EACH 6
22 2573.502 CULVERT END CONTROLS EACH 3
23 2573.503 SEDIMENT CONTROL LOG TYPE COMPOST L F 92
24 2575.501 TURF ESTABLISHMENT LS 1