Project Items

Line Item Number Description Units Quantity
1 1 MOBILIZATION LS 1
2 2 Bollard - Remove and Reset EA 5
3 3 Flared End Section - Remove (all sizes) EA 3
4 4 Manhole - Remove EA 1
5 5 Pump Intake - Remove and Reset EA 1
6 6 Storm Sewer - Remove (all sizes) LF 97
7 7 Pavement - Remove SY 260
8 8 Common Excavation (P) (EV) (P) CY 50
9 9 Sediment Excavation and Disposal - Pond G (Clean) (P) (EV) (P) CY 100
10 10 Sediment Excavation and Disposal - Pond H (Contaminated) (P) (EV) (P) CY 1,000
11 11 Sediment Excavation and Disposal - Pond I (Contaminated) (P) (EV) (P) CY 600
12 12 Sediment Excavation and Disposal - Pond J (Contaminated) (P) (EV) (P) CY 350
13 13 Inlet Protection EA 2
14 14 Stabilized Construction Entrance EA 1
15 15 Sediment Control Fence LF 160
16 16 Sediment Control Wattle LF 343
17 17 Storm Water Management LS 1
18 18 Connect to Existing Manhole EA 2
19 19 Connect to Existing Pipe EA 1
20 20 Connect to Existing Storm Sewer EA 2
21 21 Storm Manhole (60") EA 1
22 22 15" RC FES EA 1
23 23 27" RC FES EA 1
24 24 36" RC FES EA 1
25 25 Excavate Storm Sewer EA 9
26 26 Repair Storm Sewer EA 9
27 27 15" RC Pipe Storm Sewer LF 16
28 28 27" RC Pipe Storm Sewer LF 30
29 29 36" RC Pipe Storm Sewer LF 21
30 30 Aggregate Base - Cl 5 TON 93
31 31 3.0" Trail Patch (SPWEA240B) SY 260
32 32 Restore Access Paths SY 120
33 33 Turf Establishment (Native Mix and ECB) SY 3,800