Line |
Item Number |
Description |
Units |
Quantity |
1 |
1 |
MOBILIZATION |
LS |
1 |
2 |
2 |
Bollard - Remove and Reset |
EA |
5 |
3 |
3 |
Flared End Section - Remove (all sizes) |
EA |
3 |
4 |
4 |
Manhole - Remove |
EA |
1 |
5 |
5 |
Pump Intake - Remove and Reset |
EA |
1 |
6 |
6 |
Storm Sewer - Remove (all sizes) |
LF |
97 |
7 |
7 |
Pavement - Remove |
SY |
260 |
8 |
8 |
Common Excavation (P) (EV) (P) |
CY |
50 |
9 |
9 |
Sediment Excavation and Disposal - Pond G (Clean) (P) (EV) (P) |
CY |
100 |
10 |
10 |
Sediment Excavation and Disposal - Pond H (Contaminated) (P) (EV) (P) |
CY |
1,000 |
11 |
11 |
Sediment Excavation and Disposal - Pond I (Contaminated) (P) (EV) (P) |
CY |
600 |
12 |
12 |
Sediment Excavation and Disposal - Pond J (Contaminated) (P) (EV) (P) |
CY |
350 |
13 |
13 |
Inlet Protection |
EA |
2 |
14 |
14 |
Stabilized Construction Entrance |
EA |
1 |
15 |
15 |
Sediment Control Fence |
LF |
160 |
16 |
16 |
Sediment Control Wattle |
LF |
343 |
17 |
17 |
Storm Water Management |
LS |
1 |
18 |
18 |
Connect to Existing Manhole |
EA |
2 |
19 |
19 |
Connect to Existing Pipe |
EA |
1 |
20 |
20 |
Connect to Existing Storm Sewer |
EA |
2 |
21 |
21 |
Storm Manhole (60") |
EA |
1 |
22 |
22 |
15" RC FES |
EA |
1 |
23 |
23 |
27" RC FES |
EA |
1 |
24 |
24 |
36" RC FES |
EA |
1 |
25 |
25 |
Excavate Storm Sewer |
EA |
9 |
26 |
26 |
Repair Storm Sewer |
EA |
9 |
27 |
27 |
15" RC Pipe Storm Sewer |
LF |
16 |
28 |
28 |
27" RC Pipe Storm Sewer |
LF |
30 |
29 |
29 |
36" RC Pipe Storm Sewer |
LF |
21 |
30 |
30 |
Aggregate Base - Cl 5 |
TON |
93 |
31 |
31 |
3.0" Trail Patch (SPWEA240B) |
SY |
260 |
32 |
32 |
Restore Access Paths |
SY |
120 |
33 |
33 |
Turf Establishment (Native Mix and ECB) |
SY |
3,800 |