Line |
Item Number |
Description |
Units |
Quantity |
Base Bid |
Schedule A: Well 13 Base Bid Items |
1 |
1 |
Mobilize/Demobilize |
LS |
1 |
2 |
2 |
Remove/reinstall submersible well installation |
LS |
1 |
3 |
3 |
Recondition pump |
LS |
1 |
4 |
4 |
Furnish and install wear rings-including impeller and casting machining |
EA |
4 |
5 |
5 |
Furnish and install bowl shaft |
EA |
1 |
6 |
6 |
Furnish and install set of pump bearings |
EA |
1 |
7 |
7 |
Recondition motor (including shipping to and from repair shop) |
LS |
1 |
8 |
8 |
Furnish and install 10inch drop pipe T&C |
LF |
262 |
9 |
9 |
Sandblast and epoxy coat existing 10inch drop pipe |
LF |
262 |
10 |
10 |
Shop labor rate |
HRS |
10 |
11 |
11 |
Wire brush 416feet of 18inch well casing |
LS |
1 |
12 |
12 |
Televise and inspect well |
LS |
1 |
13 |
13 |
Test and calibrate existing 8inch flow meter |
LS |
1 |
14 |
14 |
Furnish and install (2) 1inch PVC Sch 40 transducer and sounder conduits (280ft ea.) |
LF |
560 |
15 |
15 |
Furnish and install 10inch Flomatic 80DIX drop pipe check valve |
EA |
1 |
16 |
16 |
Furnish and install Baker pitless sample tap |
EA |
1 |
17 |
17 |
Allowance for miscellaneous repairs |
EA |
1 |
Schedule B: Well 15 Base Bid Items |
18 |
18 |
Mobilize/Demobilize |
LS |
1 |
19 |
19 |
Remove/reinstall submersible well installation |
LS |
1 |
20 |
20 |
Recondition pump |
LS |
1 |
21 |
21 |
Furnish and install wear rings-including impeller and casting machining |
EA |
4 |
22 |
22 |
Furnish and install bowl shaft |
EA |
1 |
23 |
23 |
Furnish and install set of pump bearings |
EA |
1 |
24 |
24 |
Recondition motor (including shipping to and from repair shop) |
LS |
1 |
25 |
25 |
Furnish and install 10inch drop pipe T&C |
LF |
291 |
26 |
26 |
Sandblast and epoxy coat existing 10inch drop pipe |
LF |
291 |
27 |
27 |
Shop labor rate |
HRS |
10 |
28 |
28 |
Wire brush 415ft of 18inch well casing |
LS |
1 |
29 |
29 |
Televise and inspect well |
LS |
1 |
30 |
30 |
Test and calibrate existing 12inch flow meter |
LS |
1 |
31 |
31 |
Furnish and install (2) 1inch PVC Sch 40 transducer and sounder conduits (300ft ea.) |
LF |
600 |
32 |
32 |
Furnish and install 10inch Flomatic 80DIX drop pipe check valve |
EA |
1 |
33 |
33 |
Furnish and install Baker pitless sample tap |
EA |
1 |
34 |
34 |
Allowance for miscellaneous repairs |
LS |
1 |
Schedule C: Well 16 Base Bid Items |
35 |
35 |
Mobilize/Demobilize |
LS |
1 |
36 |
36 |
Remove/reinstall submersible well installation |
LS |
1 |
37 |
37 |
Recondition pump |
LS |
1 |
38 |
38 |
Furnish and install wear rings-including impeller and casting machining |
EA |
2 |
39 |
39 |
Furnish and install bowl shaft |
EA |
1 |
40 |
40 |
Furnish and install set of pump bearings |
EA |
1 |
41 |
41 |
Recondition motor (including shipping to and from repair shop) |
LS |
1 |
42 |
42 |
Furnish and install 10inch drop pipe T&C |
LF |
300 |
43 |
43 |
Sandblast and epoxy coat existing 8 drop pipe |
LF |
300 |
44 |
44 |
Shop labor rate |
HRS |
10 |
45 |
45 |
Wire brush 465ft of 18inch well casing |
LS |
1 |
46 |
46 |
Televise and inspect well |
LS |
1 |
47 |
47 |
Test and calibrate existing 12inch flow meter |
LS |
1 |
48 |
48 |
Furnish and install (2) 1inch PVC Sch 40 transducer and sounder conduits (300ft ea.) |
LF |
300 |
49 |
49 |
Furnish and install 10inch Flomatic 80DIX drop pipe check valve |
EA |
1 |
50 |
50 |
Furnish and install Baker pitless sample tap |
EA |
1 |
51 |
51 |
Allowance for miscellaneous repairs |
LS |
1 |
Alternate 1 |
Well 13: Alternate 1 |
52 |
52 |
Mobilize/Demobilize equipment to clean well |
LS |
1 |
53 |
53 |
Airlift Sandstone |
CY |
100 |
54 |
54 |
Pressure surging and decompressing |
HRS |
20 |
55 |
55 |
Re-televise well |
LS |
1 |
Well 15: Alternate 1 |
56 |
56 |
Mobilize/Demobilize equipment to clean well |
LS |
1 |
57 |
57 |
Airlift sandstone |
CY |
100 |
58 |
58 |
Pressure surging and decompressing |
HRS |
20 |
59 |
59 |
Re-televise well |
LS |
1 |
Well 16: Alternate 1 |
60 |
60 |
Mobilize/Demobilize equipment to clean well |
LS |
1 |
61 |
61 |
Airlift sandstone |
CY |
100 |
62 |
62 |
Pressure surging and decompressing |
HRS |
20 |
63 |
63 |
Re-televise well |
LS |
1 |
Alternate 2 |
Well 13: Alternate 2 |
64 |
64 |
Furnish and install power cable |
LF |
230 |
65 |
65 |
Furnish and install waterproof cable splice kit |
EA |
2 |
Well 15: Alternate 2 |
66 |
66 |
Furnish and install power cable |
LF |
306 |
67 |
67 |
Furnish and install waterproof cable splice kit |
EA |
2 |
Well 16: Alternate 2 |
68 |
68 |
Furnish and install power cable |
LF |
315 |
69 |
69 |
Furnish and install waterproof cable splice kit |
EA |
2 |
Alternate 3 |
Well 13: Alternate 3 |
70 |
70 |
Furnish and install submersible motor |
EA |
1 |
Well 15: Alternate 3 |
71 |
71 |
Furnish and install submersible motor |
EA |
1 |
Well 16: Alternate 3 |
72 |
72 |
Furnish and install submersible motor |
EA |
1 |
Alternate 4 |
Well 13: Alternate 4 |
73 |
73 |
Furnish and install pump |
EA |
1 |
Well 15: Alternate 4 |
74 |
74 |
Furnish and install pump |
EA |
1 |
Well 16: Alternate 4 |
75 |
75 |
Furnish and install pump |
EA |
1 |
Alternate 5 |
Well 13: Alternate 5 |
76 |
76 |
Rewind submersible motor |
EA |
1 |
Well 15: Alternate 5 |
77 |
77 |
Rewind submersible motor |
EA |
1 |
Well 16: Alternate 5 |
78 |
78 |
Rewind submersible motor |
EA |
1 |