Line |
Item Number |
Description |
Units |
Quantity |
Base Bid |
1 |
1 |
MOBILIZATION |
LS |
1 |
2 |
2 |
WASTE DISPOSAL |
LS |
1 |
3 |
3 |
DISINFECTION & TESTING |
LS |
1 |
4 |
4 |
SITE RESTORATION |
LS |
1 |
5 |
5 |
2-YEAR WARRANTY |
LS |
1 |
6 |
6 |
TEMPORARY SITE FENCING |
LS |
1 |
7 |
7 |
CAULKING |
LS |
1 |
8 |
8 |
REMOVE BY AIR ARC GOUGING, CUTTING TORCH OR GRINDING ALL SURFACE IMPERFECTIONS INCLUDING ERECTION SCAB MARKS |
LS |
1 |
9 |
9 |
REMOVE INTERIOR WET AND DRY FALL ARREST SYSTEMS. REPLACE INTERIOR DRY FALL ARREST SYSTEM WITH NEW CABLE STYLE SYSTEM |
LS |
1 |
10 |
10 |
REMOVE INTERIOR WET LADDER AND SUPPORTS. GRIND FLUSH SURFACE IMPERFECTIONS |
LS |
1 |
11 |
11 |
REPLACE MISSING/BROKEN LIGHT BULBS WITH NEW LED BULBS |
LS |
1 |
12 |
12 |
REMOVE AND REPLACE OVERFLOW PIPE U-BOLTS AND HARDWARE |
LS |
1 |
13 |
13 |
FURNISH & INSTALL SUBMERSIBLE MIXING SYSTEM |
LS |
1 |
14 |
14 |
REMOVE AND REPLACE ALL HATCH/MANWAY HARDWARE AND GASKETS AND INSTALL OWNER FURNISHED LOCKS |
LS |
1 |
15 |
15 |
CLEAN OUT EXISTING OVERFLOW PIPE AND REMOVE AND REPLACE OVERFLOW DISCHARGE SCREEN |
LS |
1 |
16 |
16 |
REMOVE AND REPLACE NEOPRENE GASKET AND BANDS COVERING GAP BETWEEN ACCESS TUBE AND TANK ROOF |
LS |
1 |
17 |
17 |
REMOVE AND REPLACE EXISTING ROOF HANDRAIL SYSTEM |
LS |
1 |
18 |
18 |
REMOVE LOOSE, CRACKED AND DETERIORATED CONCRETE ON TANK BASE PLATES/FOUNDATION TO SOUND SUBSTRATE AND RESURFACE USING NON-SHRINK 3000 PSI GROUT OR ELASTOMERIC SEALANT AS APPLICABLE |
LS |
1 |
19 |
19 |
DEHUMIDIFICATION |
LS |
1 |
20 |
20 |
CONTAINMENT SYSTEM |
LS |
1 |
21 |
21 |
INTERIOR WET - COMPLETE COATING REMOVAL AND REPLACEMENT |
LS |
1 |
22 |
22 |
INTERIOR DRY COMPLETE COATING REMOVAL & REPLACEMENT AND MAINTENANCE |
LS |
1 |
23 |
23 |
EXTERIOR COMPLETE COATING REMOVAL & REPLACEMENT |
LS |
1 |
24 |
24 |
EXTERIOR COATING - LOGO |
LS |
1 |
Bid Alternate 1 |
25 |
25 |
TOTAL 5 YEAR WARRANTY (ADD ADDITIONAL 3 YR TO BASE BID 2-YEAR WARRANTY) |
LS |
1 |