Project Items

Line Item Number Description Units Quantity
Part 1. Mobilization, Site Preparation, and Erosion Control
1 1 MOBILIZATION AND DEMOBILIZATION LS 1
2 2 SILT FENCE LF 350
3 3 WETLAND TREATMENT CELL ABANDONMENT LS 1
4 4 RAW SEWAGE MANHOLE REMOVAL LS 1
5 5 FLOW METERING MANHOLE COMPONENT REMOVAL LS 1
6 6 DISINFECTION TANK IMPROVEMENTS LS 1
Part 2. Wastewater Treatment Facility Improvements
7 7 HIGH TENSILE WIRE FENCE LF 550
8 8 YARD PIPING LS 1
9 9 INTAKE DAMPER LS 1
10 10 SPLIT-SYSTEM AIR-CONDITIONING UNIT LS 1
11 11 SEPTIC TANK IMPROVEMENTS LS 1
12 12 EQUALIZATION TANK IMPROVEMENTS LS 1
13 13 SEPTIC TANK #1 LS 1
14 14 SEPTIC TANK #2 LS 1
15 15 AERATED MEMBRANE BIOREACTOR EACH 2
16 16 CONTROL SYSTEM EQUIPMENT LS 1
17 17 FLOWMETER EQUIPMENT LS 1
18 18 TURBIDITY EQUIPMENT LS 1
19 19 ULTRAVIOLET DISINFECTION EQUIPMENT LS 1
20 20 POND AERATION SYSTEM LS 1
Part 3. Electrical Improvements
21 21 ELECTRICAL WORK LS 1
Part 4. Site Restoration
22 22 SITE RESTORATION SY 1,800