Project Items
Line | Item Number | Description | Units | Quantity |
---|---|---|---|---|
2021.501/00010 | MOBILIZATION | LUMP SUM | 1 | |
2104.501/00010 | REMOVE PIPE CULVERTS | LIN FT | 58 | |
2104.503/00121 | REMOVE BITUMINOUS PAVEMENT | SQ FT | 240 | |
2112.619/00010 | SHOULDER PREPARATION | ROAD STA | 314 | |
2118.501/00050 | AGGREGATE SURFACING CLASS 5 | TON | 540 | |
2211.501/00050 | AGGREGATE BASE CLASS 5 | TON | 10 | |
2357.502/00010 | BITUMINOUS MATERIAL FOR TACK COAT | GALLON | 6,751 | |
2360.501/12200 | TYPE SP 9.5 WEARING COURSE MIX (2,B) | TON | 4,635 | |
2360.502/12200 | TYPE SP 9.5 NON WEAR COURSE MIX (2,B) | TON | 3,726 | |
2501.511/20150 | 15" CS PIPE CULVERT | LIN FT | 58 | |
2540.602/00150 | MAIL BOX SUPPORT | EACH | 61 | |
2563.601/00010 | TRAFFIC CONTROL | LUMP SUM | 1 | |
2573.533/00012 | SEDIMENT CONTROL LOG TYPE WOOD FIBER | LIN FT | 40 | |
2574.508/00011 | FERTILIZER TYPE 1 | POUND | 500 | |
2574.525/00010 | COMMON TOPSOIL BORROW | CU YD | 647 | |
2574.578/00010 | SOIL BED PREPARATION | ACRE | 2.4 | |
2575.501/00010 | SEEDING | ACRE | 2.4 | |
2575.502/25121 | SEED MIXTURE 25-121 | POUND | 150 | |
2575.560/00020 | HYDRAULIC MULCH MATRIX | POUND | 6,023 | |
2575.572/00010 | RAPID STABILIZATION METHOD 4 | SQ YD | 100 | |
2580.603/00010 | INTERIM PAVEMENT MARKING | LIN FT | 9,299 | |
2582.502/10104 | 4" SOLID LINE PAINT | LIN FT | 39,320 | |
2582.502/10124 | 24" SOLID LINE PAINT | LIN FT | 12 | |
2582.502/10204 | 4" BROKEN LINE PAINT | LIN FT | 2,900 |