Project Items
Line | Item Number | Description | Units | Quantity |
---|---|---|---|---|
1 | 2021.501/00010 | MOBILIZATION | LS | 1 |
2 | 2021.601 | RAILROAD PROTECTIVE SERVICES | LS | 1 |
3 | 2104.503/00315 | REMOVE CURB AND GUTTER | L F | 32 |
4 | 2104.518/00140 | REMOVE CONCRETE WALK | S F | 96 |
5 | 2104.618/00300 | REMOVE AND REPLACE BITUMINOUS PAVEMENT | S F | 36 |
6 | 2106.507/00040 | EXCAVATION - SUBGRADE | C Y | 25 |
7 | 2106.607/00030 | EXCAVATION SPECIAL (P) | C Y | 129 |
8 | 2211.509 | AGGREGATE BASE CLASS 5 | TON | 25 |
9 | 2232.504/00130 | MILL BITUMINOUS SURFACE (3.5") (P) | S Y | 9,432 |
10 | 2360.509/22200 | TYPE SP 12.5 WEARING COURSE MIXTURE (2,B) | TON | 2,224 |
11 | 2504.602/00035 | ADJUST VALVE BOX-WATER | EACH | 1 |
12 | 2506.502/06020 | ADJUST FRAME AND RING CASTING | EACH | 1 |
13 | 2506.503/08000 | RECONSTRUCT DRAINAGE STRUCTURE | L F | 1 |
14 | 2521.602/00030 | DRILL AND GROUT REINF BAR (EPOXY COATED) | EACH | 12 |
15 | 2521.618/00201 | CONCRETE WALK | S F | 96 |
16 | 2531.603/24070 | CONCRETE CURB AND GUTTER | L F | 32 |
17 | 2531.618/00010 | TRUNCATED DOMES | S F | 16 |
18 | 2563.601/00010 | TRAFFIC CONTROL | LS | 1 |
19 | 2575.602/00700 | SITE RESTORATION | EACH | 2 |
20 | 2580.503/00010 | INTERIM PAVEMENT MARKING | L F | 380 |
21 | 2582.503/10104 | 4" SOLID LINE PAINT | L F | 6,708 |
22 | 2582.503/10124 | 24" SOLID LINE PAINT | L F | 48 |
23 | 2582.518/01000 | PAVEMENT MESSAGE PAINT | S F | 62 |