Line |
Item Number |
Description |
Units |
Quantity |
SAP 064-599-125 Springdale Twp. Bridge Replacement |
1 |
2021.501 |
MOBILIZATION |
LS |
1 |
2 |
2101.501 |
CLEARING AND GRUBBING |
LS |
1 |
3 |
2106.507 |
EXCAVATION - COMMON (P) |
C Y |
1,183 |
4 |
2106.507 |
COMMON EMBANKMENT (CV) (P) |
C Y |
1,579 |
5 |
2118.509 |
AGGREGATE SURFACING CLASS 5 |
TON |
684 |
6 |
2123.510 |
3.0 CU YD SHOVEL |
HOUR |
10 |
7 |
2123.510 |
DOZER |
HOUR |
10 |
8 |
2412.502 |
10X6 PRECAST CONCRETE BOX CULVERT END SECTION |
EACH |
4 |
9 |
2412.503 |
10X6 PRECAST CONCRETE BOX CULVERT |
L F |
108 |
10 |
2442.501 |
REMOVE EXISTING BRIDGE |
LS |
1 |
11 |
2451.507 |
STRUCTURE EXCAVATION CLASS U (P) |
C Y |
942 |
12 |
2451.507 |
GRANULAR BACKFILL (CV) (P) |
C Y |
882 |
13 |
2451.609 |
PIPE BEDDING MATERIAL |
TON |
300 |
14 |
2511.509 |
RANDOM RIPRAP CLASS III |
TON |
180 |
15 |
2520.507 |
LEAN MIX BACKFILL |
C Y |
10 |
16 |
2563.601 |
TRAFFIC CONTROL |
LS |
1 |
17 |
2573.501 |
EROSION CONTROL SUPERVISOR |
LS |
1 |
18 |
2573.503 |
FLOTATION SILT CURTAIN TYPE MOVING WATER |
L F |
200 |
19 |
2573.503 |
SEDIMENT CONTROL LOG TYPE STRAW |
L F |
995 |
20 |
2575.501 |
TURF ESTABLISHMENT |
LS |
1 |
21 |
2575.504 |
RAPID STABILIZATION METHOD 4 |
S Y |
500 |
22 |
2575.504 |
ROLLED EROSION PREVENTION CATEGORY 25 |
S Y |
3,639 |
SAP 064-599-130 Westline Twp. Bridge Replacement |
1 |
2021.501 |
MOBILIZATION |
LS |
1 |
2 |
2104.503 |
REMOVE PIPE CULVERTS |
L F |
74 |
3 |
2118.509 |
AGGREGATE SURFACING CLASS 5 |
TON |
353 |
4 |
2123.510 |
3.0 CU YD SHOVEL |
HOUR |
10 |
5 |
2123.510 |
DOZER |
HOUR |
10 |
6 |
2401.601 |
APPROACH GRADING |
LS |
1 |
7 |
2412.502 |
14X8 PRECAST CONCRETE BOX CULVERT END SECTION |
EACH |
2 |
8 |
2412.503 |
14x8 PRECAST CONCRETE BOX CULVERT |
L F |
62 |
9 |
2442.501 |
REMOVE EXISTING BRIDGE |
LS |
1 |
10 |
2451.507 |
STRUCTURE EXCAVATION CLASS U (P) |
C Y |
2,436 |
11 |
2451.507 |
GRANULAR BACKFILL (CV) (P) |
C Y |
1,850 |
13 |
2451.609 |
PIPE BEDDING MATERIAL |
TON |
258 |
14 |
2501.502 |
36" GS PIPE APRON |
EACH |
1 |
15 |
2501.503 |
36" CS PIPE CULVERT |
L F |
70 |
16 |
2511.509 |
RANDOM RIPRAP CLASS III |
TON |
190 |
17 |
2563.601 |
TRAFFIC CONTROL |
LS |
1 |
18 |
2573.501 |
EROSION CONTROL SUPERVISOR |
LS |
1 |
19 |
2573.502 |
CULVERT END CONTROLS |
EACH |
1 |
20 |
2573.503 |
FLOTATION SILT CURTAIN TYPE MOVING WATER |
L F |
200 |
21 |
2573.503 |
SEDIMENT CONTROL LOG TYPE STRAW |
L F |
490 |
22 |
2575.501 |
TURF ESTABLISHMENT |
LS |
1 |
23 |
2575.504 |
RAPID STABILIZATION METHOD 4 |
S Y |
500 |
24 |
2575.504 |
ROLLED EROSION PREVENTION CATEGORY 25 |
S Y |
1,024 |
SAP 064-599-134 Redwood Falls Twp. Bridge Replacement |
1 |
2021.501 |
MOBILIZATION |
LS |
1 |
2 |
2104.502 |
REMOVE SIGN |
EACH |
2 |
3 |
2118.509 |
AGGREGATE SURFACING CLASS 5 |
TON |
346 |
4 |
2123.510 |
3.0 CU YD SHOVEL |
HOUR |
10 |
5 |
2123.510 |
DOZER |
HOUR |
10 |
6 |
2401.601 |
APPROACH GRADING |
LS |
1 |
7 |
2412.502 |
10X6 PRECAST CONCRETE BOX CULVERT END SECTION |
EACH |
2 |
8 |
2412.503 |
10X6 PRECAST CONCRETE BOX CULVERT |
L F |
112 |
9 |
2442.501 |
REMOVE EXISTING BRIDGE |
LS |
1 |
10 |
2451.507 |
STRUCTURE EXCAVATION CLASS U (P) |
C Y |
4,669 |
11 |
2451.507 |
GRANULAR BACKFILL (CV) (P) |
C Y |
3,534 |
13 |
2451.609 |
PIPE BEDDING MATERIAL |
TON |
332 |
14 |
2502.503 |
RELOCATE PIPE DRAIN |
LF |
33 |
15 |
2511.509 |
RANDOM RIPRAP CLASS III |
TON |
310 |
16 |
2563.601 |
TRAFFIC CONTROL |
LS |
1 |
17 |
2573.501 |
EROSION CONTROL SUPERVISOR |
LS |
1 |
18 |
2573.503 |
FLOTATION SILT CURTAIN TYPE MOVING WATER |
L F |
200 |
19 |
2573.503 |
SEDIMENT CONTROL LOG TYPE STRAW |
L F |
663 |
20 |
2575.501 |
TURF ESTABLISHMENT |
LS |
1 |
21 |
2575.504 |
RAPID STABILIZATION METHOD 4 |
S Y |
500 |
22 |
2575.504 |
ROLLED EROSION PREVENTION CATEGORY 25 |
S Y |
2,456 |