Project Items

Line Item Number Description Units Quantity
1 2021.501 MOBILIZATION LUMP SUM 1
2 2104.502 REMOVE DRAINAGE STRUCTURE EACH 1
3 2104.503 REMOVE CURB AND GUTTER LIN FT 595
4 2104.503 REMOVE PIPE SEWERS LIN FT 17
5 2104.504 REMOVE BITUMINOUS PAVEMENT SQ YD 90
6 2104.504 REMOVE CONCRETE DRIVEWAY PAVEMENT SQ YD 26
7 2106.507 EXCAVATION - COMMON (P) CU YD 225
8 2106.507 EXCAVATION - SUBGRADE CU YD 12
9 2106.507 STABILIZING AGGREGATE (CV) CU YD 12
10 2118.509 AGGREGATE SURFACING CLASS 2 TON 285
11 2232.504 MILL BITUMINOUS SURFACE (3.5") SQ YD 4,060
12 2360.509 TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,C) TON 500
13 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) TON 365
14 2503.503 12" PVC PIPE SEWER LIN FT 17
15 2503.602 CONNECT TO EXISTING STORM SEWER EACH 3
16 2504.602 ADJUST VALVE BOX EACH 4
17 2506.502 ADJUST FRAME AND RING CASTING EACH 2
18 2506.502 CASTING ASSEMBLY EACH 4
19 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 LIN FT 10.3
20 2506.602 CASTING ASSEMBLY SPECIAL EACH 2
21 2531.503 CONCRETE CURB AND GUTTER DESIGN B618 LIN FT 595
22 2531.504 7" CONCRETE DRIVEWAY PAVEMENT SQ YD 270
23 2563.601 TRAFFIC CONTROL LUMP SUM 1
24 2573.502 STORM DRAIN INLET PROTECTION EACH 11
25 2574.507 COMMON TOPSOIL BORROW CU YD 35
26 2575.501 TURF ESTABLISHMENT LUMP SUM 1
27 2582.503 24" SOLID LINE PAINT LIN FT 125
28 2582.503 4" DOUBLE SOLID LINE PAINT LIN FT 810
29 2582.518 PAVEMENT MESSAGE PAINT SQ FT 124