Project Items
Line |
Item Number |
Description |
Units |
Quantity |
1 |
2021.501 |
MOBILIZATION |
LUMP SUM |
1 |
2 |
2104.504 |
REMOVE BITUMINOUS PAVEMENT |
SQ YD |
41 |
3 |
2104.518 |
REMOVE CONCRETE PAVEMENT |
SQ FT |
165 |
4 |
2106.507 |
EXCAVATION - SUBGRADE |
CU YD |
50 |
5 |
2211.509 |
AGGREGATE BASE CLASS 5 |
TON |
100 |
6 |
2232.504 |
MILL BITUMINOUS SURFACE |
SQ YD |
422 |
7 |
2301.504 |
CONCRETE PAVEMENT 8.0" |
SQ YD |
18 |
8 |
2356.504 |
BITUMINOUS SEAL COAT |
SQ YD |
7,111 |
9 |
2356.506 |
BITUMINOUS MATERIAL FOR SEAL COAT |
GALLON |
1,849 |
10 |
2360.509 |
TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) |
TON |
850 |
11 |
2521.618 |
CONCRETE CURB RAMP WALK |
SQ FT |
250 |
12 |
2531.603 |
CONCRETE CURB AND GUTTER |
LIN FT |
30 |
13 |
2531.618 |
TRUNCATED DOMES |
SQ FT |
40 |
14 |
2563.601 |
TRAFFIC CONTROL |
LUMP SUM |
1 |
15 |
2573.502 |
STORM DRAIN INLET PROTECTION |
EACH |
1 |
16 |
2574.609 |
COMMON TOPSOIL BORROW |
TON |
106 |
17 |
2575.501 |
TURF ESTABLISHMENT |
LUMP SUM |
1 |