1 2011.601 CONSTRUCTION SURVEYING LS 1
2 2021.501 MOBILIZATION LS 1
3 2101.502 CLEARING EACH 6
4 2101.502 GRUBBING EACH 6
5 2101.505 CLEARING ACRE 0.2
6 2101.505 GRUBBING ACRE 0.2
7 2104.503 REMOVE PIPE CULVERTS L F 1,586
8 2106.507 EXCAVATION - COMMON (EV) (P) CU YD 122,713
9 2106.507 COMMON EMBANKMENT (CV) (P) C Y 136,574
10 2123.510 MOTOR GRADER HOUR 25
11 2123.510 3.0 CU YD SHOVEL HOUR 25
12 2123.510 DOZER HOUR 25
13 2211.509 AGGREGATE BASE CLASS 5 TON 55,956
14 2215.504 FULL DEPTH RECLAMATION S Y 54,499
15 2451.609 GRANULAR BACKFILL TON 9,989
16 2451.609 PIPE BEDDING MATERIAL TON 1,245
17 2501.502 18" RC PIPE APRON EACH 14
18 2501.502 24" RC PIPE APRON EACH 8
19 2501.502 48" RC PIPE APRON EACH 2
20 2501.502 21" CS SAFETY APRON EACH 2
21 2501.502 15" CS SAFETY APRON EACH 55
22 2501.502 18" CS SAFETY APRON EACH 3
23 2501.503 15" CS PIPE CULVERT L F 1,780
24 2501.503 18" CS PIPE CULVERT L F 140
25 2501.503 21" CS PIPE CULVERT L F 160
26 2501.503 18" RC PIPE CULVERT L F 532
27 2501.503 24" RC PIPE CULVERT L F 310
28 2501.503 48" RC PIPE CULVERT L F 108
29 2502.503 8" PVC PIPE DRAIN, SDR 35 LF 235
30 2502.503 10" PVC PIPE DRAIN, SDR 35 LF 395
31 2502.503 12" PVC PIPE DRAIN, SDR 35 LF 187
32 2502.503 18" PVC PIPE DRAIN, SDR 35 LF 125
33 2502.602 RELOCATE DROP INLET EACH 16
34 2506.502 CONSTRUCT DRAINAGE STRUCT DESIGN DROP INLET EACH 9
35 2511.509 RANDOM RIPRAP CLASS III TON 150
36 2563.601 TRAFFIC CONTROL LS 1
37 2573.502 STORM DRAIN INLET PROTECTION EACH 43
38 2573.502 CULVERT END CONTROLS EACH 43
39 2574.508 FERTILIZER TYPE 3 LB 7,608
40 2575.505 SEEDING (P) ACRE 38.04
41 2575.505 DISK ANCHORING (P) ACRE 22.04
42 2575.508 SEED MIXTURE 25-142 LB 1,648
43 2575.508 SEED MIXTURE 25-151 LB 172
44 2575.509 MULCH MATERIAL TYPE 3 TON 44.08
45 2575.523 RAPID STABILIZATION METHOD 3 MGAL 98