Line |
Item Number |
Description |
Units |
Quantity |
SAP 071-620-005 2022-CSAH 20 Reconstruction (CSAH 16 to CSAH 3) Reconstruction - SAP 071-620-005 |
1 |
2021.501 |
MOBILIZATION |
LS |
0.75 |
2 |
2051.501 |
MAINT AND RESTORATION OF HAUL ROADS |
LS |
1 |
3 |
2101.501 |
CLEARING AND GRUBBING |
LS |
1 |
4 |
2104.502 |
SALVAGE MAIL BOX SUPPORT |
EACH |
7 |
5 |
2104.502 |
SALVAGE FIRE NUMBER |
EACH |
9 |
6 |
2104.502 |
SALVAGE CULVERT MARKER |
EACH |
2 |
7 |
2104.503 |
REMOVE PIPE CULVERTS |
L F |
132 |
8 |
2104.503 |
REMOVE GUARDRAIL |
L F |
661 |
9 |
2104.503 |
SAWING BITUMINOUS PAVEMENT (FULL DEPTH) |
L F |
26 |
10 |
2104.503 |
SAWING CONCRETE PAVEMENT (FULL DEPTH) |
L F |
15 |
11 |
2104.503 |
SALVAGE PIPE CULVERT |
L F |
80 |
12 |
2104.518 |
REMOVE BITUMINOUS DRIVEWAY PAVEMENT |
S F |
1,582 |
13 |
2104.518 |
REMOVE CONCRETE DRIVEWAY PAVEMENT |
S F |
278 |
14 |
2104.504 |
REMOVE BITUMINOUS PAVEMENT |
S Y |
56,605 |
15 |
2106.507 |
EXCAVATION - MUCK (EV) |
CY |
51,323 |
16 |
2106.507 |
EXCAVATION-COMMON (EV) |
CY |
6,162 |
17 |
2106.507 |
SELECT GRANULAR EMBANKMENT (CV) |
C Y |
51,323 |
18 |
2106.507 |
COMMON EMBANKMENT (CV) |
C Y |
21,071 |
19 |
2123.510 |
DOZER |
HOUR |
20 |
20 |
2130.523 |
WATER |
MGAL |
200 |
21 |
2211.509 |
AGGREGATE BASE CLASS 5 |
TON |
23,206 |
22 |
2221.609 |
SHOULDER BASE AGGREGATE SPECIAL |
TON |
1,940 |
23 |
2232.604 |
MILL BITUMINOUS PAVEMENT (SPECIAL) |
S Y |
81 |
24 |
2360.509 |
TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) |
TON |
7,482 |
25 |
2360.509 |
TYPE SP 12.5 WEARING COURSE MIXTURE (2,C) |
TON |
7,317 |
27 |
2451.507 |
COARSE AGGREGATE BEDDING (CV) |
C Y |
53 |
28 |
2501.502 |
12" CS SAFETY APRON AND GRATE DESIGN 3128 |
EACH |
2 |
29 |
2501.502 |
15" CS SAFETY APRON AND GRATE DESIGN 3128 |
EACH |
8 |
30 |
2501.502 |
18" PC-CS SAFETY APRON AND GRATE DESIGN 3128 |
EACH |
2 |
31 |
2501.502 |
72" RC PIPE APRON |
EACH |
2 |
32 |
2501.502 |
INSTALL CULVERT MARKER |
EACH |
2 |
33 |
2501.503 |
12" CP PIPE CULVERT |
L F |
30 |
34 |
2501.503 |
15" CP PIPE CULVERT |
L F |
232 |
35 |
2501.503 |
18" CP PIPE CULVERT |
L F |
62 |
36 |
2501.503 |
24" RC PIPE CULVERT |
L F |
16 |
37 |
2501.503 |
72" RC PIPE CULVERT CLASS II |
L F |
24 |
38 |
2501.503 |
INSTALL PIPE CULVERT |
L F |
80 |
39 |
2503.602 |
CONNECT TO EXISTING CULVERT |
EACH |
2 |
40 |
2531.504 |
6" CONCRETE DRIVEWAY PAVEMENT |
S Y |
72 |
41 |
2540.602 |
INSTALL TEMPORARY MAIL BOX SUPPORT |
EACH |
7 |
42 |
2540.602 |
INSTALL FIRE NUMBER |
EACH |
9 |
43 |
2540.602 |
INSTALL MAIL BOX SUPPORT |
EACH |
7 |
44 |
2554.502 |
END TREATMENT-TANGENT TERMINAL |
EACH |
1 |
45 |
2554.503 |
TRAFFIC BARRIER DESIGN TYPE 31 |
L F |
229 |
46 |
2563.601 |
TRAFFIC CONTROL |
LS |
0.75 |
47 |
2563.601 |
DETOUR SIGNING |
LS |
1 |
48 |
2564.602 |
INSTALL STEEL POST |
EACH |
16 |
49 |
2573.502 |
CULVERT END CONTROLS |
EACH |
16 |
50 |
2573.503 |
SILT FENCE, TYPE MS |
L F |
8,656 |
51 |
2573.503 |
SEDIMENT CONTROL LOG TYPE WOOD FIBER |
L F |
5,803 |
52 |
2573.503 |
SEDIMENT CONTROL LOG TYPE STRAW |
L F |
120 |
53 |
2573.601 |
STORM WATER MANAGEMENT |
LS |
1 |
54 |
2573.610 |
SEDIMENT REMOVAL |
HOUR |
20 |
55 |
2574.505 |
SOIL BED PREPARATION |
ACRE |
22 |
56 |
2574.508 |
FERTILIZER TYPE 1 |
LB |
4,424 |
57 |
2575.504 |
ROLLED EROSION PREVENTION CATEGORY 25 |
S Y |
311 |
58 |
2575.505 |
SEEDING |
ACRE |
22 |
59 |
2575.508 |
SEED MIXTURE 21-111 |
LB |
1,579 |
60 |
2575.508 |
SEED MIXTURE 25-121 |
LB |
1,349 |
61 |
2575.508 |
HYDRAULIC MULCH MATRIX |
LB |
18,433 |
62 |
2575.508 |
HYDRAULIC BONDED FIBER MATRIX |
LB |
77,420 |
63 |
2582.503 |
4" SOLID LINE MULTI-COMPONENT GROUND IN |
L F |
5,094 |
64 |
2582.503 |
6" SOLID LINE MULTI-COMPONENT GROUND IN |
L F |
31,698 |
65 |
2582.503 |
4" BROKEN LINE MULTI-COMPONENT GROUND IN |
L F |
3,090 |
66 |
2582.503 |
8" DOTTED LINE MULTI-COMPONENT GROUND IN |
L F |
160 |
67 |
2582.503 |
4" DOUBLE SOLID LINE MULTI-COMPONENT GROUND IN |
L F |
400 |
SAP 071-620-007 2022-CSAH 20 Reconstruction (CSAH 3 to N Cty Line) Reconstruction - SAP 071-620-007 |
1 |
2021.501 |
MOBILIZATION |
LS |
0.25 |
2 |
2051.501 |
MAINT AND RESTORATION OF HAUL ROADS |
LS |
1 |
3 |
2104.502 |
SALVAGE FIRE NUMBER |
EACH |
1 |
4 |
2104.503 |
SAWING BITUMINOUS PAVEMENT (FULL DEPTH) |
L F |
168 |
5 |
2104.518 |
REMOVE BITUMINOUS DRIVEWAY PAVEMENT |
S F |
3,704 |
6 |
2104.504 |
REMOVE BITUMINOUS PAVEMENT |
S Y |
43,456 |
7 |
2112.519 |
SUBGRADE PREPARATION |
RDST |
105 |
8 |
2221.609 |
SHOULDER BASE AGGREGATE SPECIAL |
TON |
1,110 |
9 |
2232.604 |
MILL BITUMINOUS PAVEMENT (SPECIAL) |
S Y |
57 |
10 |
2360.509 |
TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) |
TON |
6,236 |
11 |
2360.509 |
TYPE SP 12.5 WEARING COURSE MIXTURE (2,C) |
TON |
6,145 |
12 |
2540.602 |
INSTALL FIRE NUMBER |
EACH |
1 |
13 |
2540.602 |
RELOCATE MAIL BOX SUPPORT |
EACH |
12 |
14 |
2563.601 |
TRAFFIC CONTROL |
LS |
0.25 |
15 |
2564.602 |
INSTALL STEEL POST |
EACH |
1 |
16 |
2574.507 |
COMMON TOPSOIL BORROW |
C Y |
200 |
17 |
2582.503 |
4" SOLID LINE MULTI-COMPONENT GROUND IN |
L F |
3,260 |
18 |
2582.503 |
6" SOLID LINE MULTI-COMPONENT GROUND IN |
L F |
21,046 |
19 |
2582.503 |
4" BROKEN LINE MULTI-COMPONENT GROUND IN |
L F |
1,015 |
20 |
2582.503 |
4" DOUBLE SOLID LINE MULTI-COMPONENT GROUND IN |
L F |
5,547 |