The browser you are using is not supported. Please use a current version of Firefox, Chrome, Edge, Safari, or Opera.
Project Items
Line |
Item Number |
Description |
Units |
Quantity |
1 |
2021.501 |
MOBILIZATION |
LS |
1 |
2 |
2051.501 |
MAINT AND RESTORATION OF HAUL ROADS |
LS |
1 |
3 |
2104.502 |
SALVAGE FIRE NUMBER |
EACH |
1 |
4 |
2106.507 |
EXCAVATION - COMMON (P) |
C Y |
1,577 |
5 |
2106.507 |
COMMON EMBANKMENT (CV) |
C Y |
854 |
6 |
2123.510 |
DOZER |
HOUR |
20 |
7 |
2130.523 |
WATER |
MGAL |
100 |
8 |
2211.509 |
AGGREGATE BASE CLASS 5 |
TON |
1,622 |
9 |
2211.609 |
SHOULDERING AGGREGATE BASE SPECIAL |
TON |
37 |
10 |
2360.509 |
TYPE SP 12.5 WEARING COURSE MIXTURE (2,C) |
TON |
849 |
11 |
2521.518 |
6" CONCRETE WALK |
S F |
48 |
12 |
2521.602 |
8" CONCRETE FLUME |
EACH |
2 |
13 |
2531.503 |
CONCRETE CURB & GUTTER DESIGN D412 |
L F |
674 |
14 |
2531.618 |
TRUNCATED DOMES |
S F |
12 |
15 |
2540.602 |
INSTALL FIRE NUMBER |
EACH |
1 |
16 |
2545.502 |
SOLAR LIGHT |
EACH |
4 |
17 |
2563.601 |
TRAFFIC CONTROL |
LS |
1 |
18 |
2573.503 |
SILT FENCE, TYPE MS |
L F |
419 |
19 |
2573.503 |
SEDIMENT CONTROL LOG TYPE WOOD FIBER |
L F |
365 |
20 |
2573.501 |
EROSION CONTROL SUPERVISOR |
LS |
1 |
21 |
2573.610 |
SEDIMENT REMOVAL |
HOUR |
20 |
22 |
2574.505 |
SOIL BED PREPARATION |
ACRE |
0.4 |
23 |
2574.508 |
FERTILIZER TYPE 1 |
LB |
80 |
24 |
2575.505 |
SEEDING |
ACRE |
0.4 |
25 |
2575.508 |
SEED MIXTURE 21-111 |
LB |
20 |
26 |
2575.508 |
SEED MIXTURE 25-121 |
LB |
24 |
27 |
2575.508 |
HYDRAULIC MULCH MATRIX |
LB |
800 |
28 |
2575.508 |
HYDRAULIC BONDED FIBER MATRIX |
LB |
1,400 |