Project Items

Line Item Number Description Units Quantity
1 2021.501 MOBILIZATION LUMP SUM 1
2 2104.502 REMOVE MAIL BOX SUPPORT EACH 27
3 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 80
4 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SQ YD 255
5 2118.509 AGGREGATE SURFACING CLASS 1 TON 5,240
6 2211.507 AGGREGATE BASE (CV) CLASS 5 CU YD 6,770
7 2215.504 STABILIZED FULL DEPTH RECLAMATION SQ YD 100,586
8 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) TON 8,762
9 2360.509 TYPE SP 12.5 WEARING COURSE MIXTURE (3,C) TON 11,367
10 2540.602 MAIL BOX EACH 27
11 2540.602 MAIL BOX SUPPORT EACH 27
12 2563.601 TRAFFIC CONTROL LUMP SUM 1
13 2563.602 RAISED PAVEMENT MARKER TEMPORARY EACH 647
14 2582.503 4" BROKEN LINE PAINT LIN FT 6,425
15 2582.503 4" DOUBLE SOLID LINE PAINT LIN FT 530
16 2582.503 4" SOLID LINE PAINT LIN FT 71,582