Project Items
Line |
Item Number |
Description |
Units |
Quantity |
1 |
2021.501 |
MOBILIZATION |
LUMP SUM |
1 |
2 |
2104.503 |
REMOVE CURB AND GUTTER |
LIN FT |
70 |
3 |
2104.504 |
REMOVE BITUMINOUS SURFACING |
S Y |
1,640 |
4 |
2104.518 |
REMOVE SIDEWALK |
S F |
575 |
5 |
2105.601 |
SITE GRADING |
LUMP SUM |
1 |
6 |
2211.607 |
AGGREGATE BASE (CV) CLASS 5 |
CY YD |
50 |
7 |
2301.501 |
CONCRETE PUMPING TRUCK |
L S |
1 |
8 |
2506.502 |
ADJUST FRAME & RING CASTING |
EACH |
3 |
9 |
2521.518 |
4" CONCRETE WALK |
SF |
575 |
10 |
2531.503 |
CONCRETE CURB AND GUTTER DESIGN B618 |
LF |
200 |
11 |
2531.507/001 |
6" CONCRETE PARKING LOT PAVEMENT |
SY |
2,612 |
12 |
2563.601 |
TRAFFIC CONTROL |
LUMP SUM |
1 |
13 |
2573.501 |
STABILIZED CONSTRUCTION EXIT |
LUMP SUM |
1 |
14 |
2573.502 |
STORM DRAIN INLET PROTECTION |
EACH |
3 |
15 |
2573.540 |
FILTER LOG TYPE STRAW BIOROLL |
LIN FT |
150 |
16 |
2574.507 |
BOULEVARD TOPSOIL BORROW |
C Y |
20 |
17 |
2575.602 |
SITE RESTORATION |
EACH |
1 |
18 |
2582.503 |
4" SOLID LINE PAINT |
L F |
1,554 |
19 |
2582.518 |
PAVEMENT MESSAGE PAINT |
SQ FT |