Line |
Item Number |
Description |
Units |
Quantity |
Base Bid |
Schedule A: Well 3 Base Bid Items |
1 |
1 |
Mobilize/Demobilize |
LS |
1 |
2 |
2 |
Remove/Reinstall Well #3 installation |
LS |
1 |
3 |
3 |
Sandblast and epoxy coat existing 10" column pipe |
LF |
160 |
4 |
4 |
Shop labor rate |
Hours |
10 |
5 |
5 |
Recondition pump |
LS |
1 |
6 |
6 |
Recondition motor (including shipping to and from repair shop) |
LS |
1 |
7 |
7 |
Recondition discharge head including new bushing and packing |
Each |
1 |
8 |
8 |
Furnish and install rubber bearing inserts 1.6875" x 2.5" |
Each |
15 |
9 |
9 |
Furnish and install column pipe .365 10" x 59.50" TBE |
Each |
1 |
10 |
10 |
Furnish and install column pipe .365 10" x 119.50" T&C |
Each |
14 |
11 |
11 |
Furnish and install column pipe .365 10" x 59.50" T&C |
Each |
1 |
12 |
12 |
Furnish and install suction pipe .365 10" x 119.5" TBE |
Each |
1 |
13 |
13 |
Set of pump bearings |
Each |
1 |
14 |
14 |
Furnish and install wear rings-including impeller and casting machining |
Each |
5 |
15 |
15 |
Wire brush 16" casing |
LS |
1 |
16 |
16 |
Televise and inspect well |
LS |
1 |
17 |
17 |
Furnish and install 10" Lakewood Bleed Back valve |
Each |
1 |
18 |
18 |
Test and calibrate 10" flow meter |
LS |
1 |
19 |
19 |
Furnish and install (2) 1" PVC Sch 40 transducer and sounder conduits |
LF |
600 |
20 |
20 |
Refurbish 10" check valve |
LS |
1 |
21 |
21 |
Allowance for miscellaneous repairs |
LS |
1 |
Schedule B: Well 4 Base Bid Items |
22 |
22 |
Mobilize/Demobilize |
Each |
1 |
23 |
23 |
Remove/Reinstall Well #4 installation |
Each |
1 |
24 |
24 |
Sandblast and epoxy coat existing 10" column pipe |
LF |
149 |
25 |
25 |
Shop labor rate |
Hours |
10 |
26 |
26 |
Recondition pump |
LS |
1 |
27 |
27 |
Recondition motor (including shipping to and from repair shop) |
Each |
1 |
28 |
28 |
Recondition discharge head including new bushing and packing |
Each |
1 |
29 |
29 |
Furnish and install rubber bearing inserts 1.6875" x 3" |
Each |
14 |
30 |
30 |
Furnish and install column pipe .365" x 10" x 59.25" T&C |
Each |
1 |
31 |
31 |
Furnish and install column pipe .365" x 10" x 119.25" T&C |
Each |
13 |
32 |
32 |
Furnish and install column pipe .365" x 10" x 59.25" TBE |
Each |
1 |
33 |
33 |
Furnish and install suction pipe .365" x 10" x 120" TBE |
Each |
1 |
34 |
34 |
Set of pump bearings |
Each |
1 |
35 |
35 |
Furnish and install wear rings-including impeller and casting machining |
Each |
5 |
36 |
36 |
Wire brush 16" casing |
Each |
1 |
37 |
37 |
Televise and inspect well |
Each |
1 |
38 |
38 |
Furnish and install 10" Lakewood Bleed Back valve |
Each |
1 |
39 |
39 |
Test and calibrate 10" flow meter |
LS |
1 |
40 |
40 |
Furnish and install (2) 1" PVC Sch 40 transducer and sounder conduits |
LF |
280 |
41 |
41 |
Refurbish 10" check valve |
LS |
1 |
42 |
42 |
Allowance for miscellaneous repairs |
LS |
1 |
Schedule C: Well 18 Base Bid Items |
43 |
43 |
Mobilize/Demobilize |
LS |
1 |
44 |
44 |
Remove/reinstall Well #18 installation |
LS |
1 |
45 |
45 |
Shop labor rate |
Hours |
10 |
46 |
46 |
Recondition pump |
LS |
1 |
47 |
47 |
Furnish and install wear rings-including impeller and casting machining |
Each |
3 |
48 |
48 |
Furnish and install bowl shaft |
Each |
1 |
49 |
49 |
Furnish and install set of pump bearings |
Each |
1 |
50 |
50 |
Recondition motor (including shipping to and from repair shop) |
LS |
1 |
51 |
51 |
Furnish and install 6" Boreline FlexiRiser drop hose (including manufacturer-recommended stainless steel fittings) |
LF |
440 |
52 |
52 |
Wire brush 12" casing |
LS |
1 |
53 |
53 |
Televise and inspect well |
LS |
1 |
54 |
54 |
Test and calibrate 10" flow meter |
Each |
1 |
55 |
55 |
Furnish and install (2) 1" PVC Sch 40 transducer and sounder conduits |
LF |
880 |
56 |
56 |
Furnish and install 6" Flomatic 80DIX discharge check valve |
Each |
1 |
57 |
57 |
Allowance for miscellaneous repairs |
LS |
1 |
Alternate 1 |
Well 18: Alternate 1 |
78 |
78 |
Mobilize/Demobilize equipment to clean Well #18 |
LS |
1 |
79 |
79 |
Airlift sandstone |
CY |
100 |
80 |
80 |
Pressure surging and decompression |
Hours |
20 |
81 |
81 |
Re-televise well |
LS |
1 |
Well 3: Alternate 1 |
58 |
58 |
Mobilize/Demobilize equipment to clean Well #3 |
LS |
1 |
59 |
59 |
Airlift sandstone |
CY |
100 |
60 |
60 |
Pressure surging and decompression |
Hours |
20 |
61 |
61 |
Re-televise well |
LS |
1 |
Well 4: Altenate 1 |
68 |
68 |
Mobilize/Demobilize equipment to clean Well #4 |
LS |
1 |
69 |
69 |
Airlift sandstone |
CY |
100 |
70 |
70 |
Pressure surging and decompression |
Hours |
20 |
71 |
71 |
Re-televise well |
LS |
1 |
Alternate 2 |
Well 18: Alternate 2 |
82 |
82 |
Furnish and install power cable: 2/0-3 w/ ground |
LF |
535 |
83 |
83 |
Furnish and install waterproof cable splice kit |
Each |
1 |
Well 3: Alternate 2 |
62 |
62 |
Furnish and install line shafting 1.5" x 120" T&C 416SS |
Each |
15 |
63 |
63 |
Furnish and install line shafting 1.5" x 60" T&C 416SS |
Each |
1 |
64 |
64 |
Furnish and install top shaft 1.6875" x 62.5" |
Each |
1 |
65 |
65 |
Furnish and install shaft sleeve 1.6875" 416SS |
Each |
16 |
Well 4: Alternate 2 |
72 |
72 |
Furnish and install line shafting 1.6875" x 120" T&C 416SS |
Each |
13 |
73 |
73 |
Furnish and install line shafting 1.6875" x 60" T&C 416SS |
Each |
1 |
74 |
74 |
Furnish and install top shaft 1.6875" x 60" T&C 416SS |
Each |
1 |
75 |
75 |
Furnish and install shaft sleeve 1.6875" 416SS |
Each |
14 |
Alternate 3 |
Well 18: Alternate 3 |
84 |
84 |
Furnish and install new submersible motor |
Each |
1 |
Well 3: Alternate 3 |
66 |
66 |
Furnish and install new motor |
Each |
1 |
Well 4: Alternate 3 |
76 |
76 |
Furnish and install new motor |
Each |
1 |
Alternate 4 |
Well 18: Alternate 4 |
85 |
85 |
Furnish and install new pump |
Each |
1 |
Well 3: Alternate 4 |
67 |
67 |
Furnish and install new pump |
Each |
1 |
Well 4: Alternate 4 |
77 |
77 |
Furnish and install new pump |
Each |
1 |