Line |
Item Number |
Description |
Units |
Quantity |
1 |
1 |
Mobillization/Demobilization |
LS |
1 |
2 |
2 |
Setup/Takedown on Pilot Hole |
EACH |
1 |
3 |
3 |
Drill and Sample Pilot Hole |
L F |
565 |
4 |
4 |
Abandon Pilot Hole (if needed) |
L F |
565 |
5 |
5 |
Setup/Takedown on Well |
EACH |
1 |
6 |
6 |
Furnish, Drill, and Drive 30-inch Diameter Casing |
L F |
100 |
7 |
7 |
Furnish and Install 24-inch Diameter Casing |
L F |
100 |
8 |
8 |
Furnish, Drill, and Drive 24-inch Diameter Casing |
L F |
160 |
9 |
9 |
Drill 24-inch Diameter Borehole |
L F |
195 |
10 |
10 |
Furnish and Install 18-inch Diameter Casing |
L F |
455 |
11 |
11 |
Drill 18-inch Open Hole |
L F |
110 |
12 |
12 |
Provide Neat Cement Grout |
C Y |
30 |
13 |
13 |
Plumbness and Alignment Test |
LS |
1 |
14 |
14 |
Furnish Development Equipment |
LS |
1 |
15 |
15 |
Install and Remove Well Development Equipment |
EACH |
1 |
16 |
16 |
Operate Well Development Equipment |
HOUR |
100 |
17 |
17 |
Remove Fill from Well |
C Y |
500 |
18 |
18 |
Furnish, Install, and Detonate Explosives |
LBS. |
100 |
19 |
19 |
Furnish Test Pumping Equipment |
LS |
1 |
20 |
20 |
Install and Remove Test Pumping Equipment |
EACH |
1 |
21 |
21 |
Operate Test Pumping Equipment |
HOUR |
30 |
22 |
22 |
Furnish, Install, and Remove Water Discharge Piping |
L F |
100 |
23 |
23 |
Furnish, Install, and Remove Water Treatment Equipment for Use During Well Development and Test Pumping Activities |
LS |
1 |
24 |
24 |
Operate Water Treatment Equipment |
HOUR |
130 |
25 |
25 |
Provide Water Treatment Chemical |
GALLON |
50 |
26 |
26 |
Televise Well |
EACH |
1 |
27 |
27 |
Well Disinfection and Sampling |
EACH |
1 |
28 |
28 |
Erosion Control |
LS |
1 |
29 |
29 |
Traffic Control |
LS |
1 |
30 |
30 |
Site Restoration |
LS |
1 |