Line |
Item Number |
Description |
Units |
Quantity |
Base Bid |
1 |
|
MOBILIZATION |
LS |
1 |
2 |
|
WASTE DISPOSAL |
LS |
1 |
3 |
|
DISINFECTION & TESTING |
LS |
1 |
4 |
|
SITE RESTORATION |
LS |
1 |
5 |
|
2-YEAR WARRANTY |
LS |
1 |
6 |
|
CAULKING |
LS |
1 |
7 |
|
REMOVE AND REINSTALL WATER METER DATA COLLECTOR ANTENNA, CABLE, HARDWARE, ETC. |
LS |
1 |
8 |
|
REMOVE BY AIR ARC GOUGING, CUTTING TORCH OR GRINDING ALL SURFACE IMPERFECTIONS INCLUDING ERECTION SCAB MARKS |
LS |
1 |
9 |
|
REMOVE AND REPLACE INTERIOR DRY FALL ARREST SYSTEMS WITH NEW CABLE STYLE SYSTEMS |
LS |
1 |
10 |
|
REPLACE MISSING/BROKEN LIGHT BULBS WITH NEW LED BULBS |
LS |
1 |
11 |
|
FURNISH & INSTALL SUBMERSIBLE MIXING SYSTEM |
LS |
1 |
12 |
|
REMOVE AND DISPOSE OF BOWL MANWAY GASKET AND REPLACE WITH A NEW GASKET |
LS |
1 |
13 |
|
REMOVE AND REPLACE ROOF VENT WITH NEW AWWA FROST-FREE DESIGN AND PRESSURE PALLET ROOF VENT |
LS |
1 |
14 |
|
REMOVE DISPOSE OF ALL EXTERIOR MANWAY HARDWARE AND GASKETS. REPLACE WITH NEW STAINLESS STEEL HARDWARE AND GASKETS. REINSTALL EXISTING LOCKS. |
LS |
1 |
15 |
|
CLEAN OUT EXISTING OVERFLOW PIPE AND REMOVE AND REPLACE OVERFLOW DISCHARGE SCREEN |
LS |
1 |
16 |
|
DEHUMIDIFICATION |
LS |
1 |
17 |
|
CONTAINMENT SYSTEM |
LS |
1 |
18 |
|
INTERIOR WET - COMPLETE COATING REMOVAL AND REPLACEMENT |
LS |
1 |
19 |
|
INTERIOR DRY - SPOT COATING REMOVAL & REPLACEMENT AND MAINTENANCE |
LS |
1 |
20 |
|
EXTERIOR - COMPLETE COATING REMOVAL AND REPLACEMENT |
LS |
1 |
21 |
|
EXTERIOR - LOGO |
LS |
1 |
Alternate 1 |
22 |
|
TOTAL 5 YEAR WARRANTY (ADD ADDITIONAL 3 YR TO BASE BID 2-YEAR WARRANTY) |
LS |
1 |