24-02 2024 Street Reconstruction Project - Schedule A: Street Improvements
1 2021.501 MOBILIZATION LS 1
2 2101.505 CLEARING ACRE 0.15
3 2101.505 GRUBBING ACRE 0.15
4 2104.502 SALVAGE MAIL BOX SUPPORT EACH 25
5 2104.502 REMOVE SIGN EACH 5
6 2104.502 SALVAGE SIGN EACH 3
7 2104.503 REMOVE CURB & GUTTER L F 7,065
8 2104.503 SAWING BIT PAVEMENT (FULL DEPTH) L F 1,561
9 2104.503 SAWING CONCRETE PAVEMENT (FULL DEPTH) L F 541
10 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT S Y 562
11 2104.504 REMOVE CONCRETE DRIVEWAY PAVEMENT S Y 359
12 2104.504 REMOVE BITUMINOUS WALK S Y 743
13 2104.518 REMOVE CONCRETE WALK S F 332
14 2104.601 REMOVE BOULDER LS 1
15 2104.601 SALVAGE AND REINSTALL LANDSCAPE STRUCTURES LS 1
16 2104.602 SALVAGE AND REINSTALL BOLLARDS EACH 2
17 2104.604 REMOVE GRAVEL DRIVEWAY S Y 86
18 2106.507 EXCAVATION - COMMON C Y 300
19 2106.507 EXCAVATION - SUBGRADE C Y 442
20 2106.507 STABILIZING AGGREGATE C Y 442
21 2106.509 STABILIZING AGGREGATE TON 19
22 2106.61 EXPLORATORY EXCAVATION HOUR 8
23 2108.504 GEOTEXTILE FABRIC TYPE 5 S Y 185
24 2112.519 SUBGRADE PREPARATION RDST 141
25 2118.509 AGGREGATE SURFACING CLASS 2 TON 20
26 2123.610 COMMON LABORERS HOUR 8
27 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 100
28 2130.523 WATER MGAL 247
29 2211.509 AGGREGATE BASE (CV) CLASS 5 TON 434
30 2215.504 FULL DEPTH RECLAMATION S Y 49,361
31 2231.609 BITUMINOUS PATCH SPECIAL TON 100
32 2360.504 TYPE SP 9.5 WEAR CRS MIX(2,B)3.0" THICK S Y 1,407
33 2360.509 TYPE SP 9.5 WEARING COURSE MIX (3,C) TON 4,258
34 2360.509 TYPE SP 12.5 NON WEAR COURSE MIX (3,C) TON 7,096
35 2504.602 IRRIGATION SYSTEM REPAIR EACH 30
36 2521.518 5" CONCRETE WALK S F 26
37 2521.518 6" CONCRETE WALK S F 801
38 2531.503 CONCRETE CURB & GUTTER DESIGN B618 L F 1,076
39 2531.503 CONCRETE CURB & GUTTER DESIGN D412 L F 4,738
40 2531.503 CONCRETE CURB & GUTTER DESIGN D412 (SLIP-FORM) L F 2,190
41 2531.504 7" CONCRETE DRIVEWAY PAVEMENT S Y 395
42 2531.604 7" CONCRETE DRIVEWAY PAVEMENT SPECIAL S Y 20
43 2531.618 TRUNCATED DOMES S F 144
44 2540.602 MAIL BOX EACH 25
45 2540.602 MAIL BOX SUPPORT EACH 25
46 2540.602 TEMPORARY MAIL BOX EACH 172
47 2557.602 REPAIR DOG FENCE EACH 30
48 2557.603 INSTALL WOOD RAIL FENCE L F 40
49 2563.601 TRAFFIC CONTROL LS 1
50 2573.501 STABILIZED CONSTRUCTION EXIT LS 1
51 2573.503 SEDIMENT CONTROL LOG TYPE STRAW L F 1,520
52 2575.504 RAPID STABILIZATION METHOD 4 S Y 1,500
53 2575.504 ROLLED EROSION PREVENTION CATEGORY 25 S Y 3,541
54 2575.523 RAPID STABILIZATION METHOD 3 MGAL 10
55 2575.523 WATER MGAL 240
56 2575.604 PERMANENT TURF ESTABLISHMENT S Y 3,541
57 2575.604 TEMPORARY STABILIZATION S Y 3,541
58 2582.503 4" DBLE SOLID LINE PAINT L F 2,049
59 2582.503 4" SOLID LINE PAINT L F 3,848
60 2582.518 CROSSWALK PAINT S F 91
61 2582.518 PAVT MSSG PAINT S F 41
24-02 2024 Street Reconstruction Project - Schedule B: Storm Sewer Improvements
62 2021.501 MOBILIZATION LS 1
63 2101.502 CLEARING EACH 41
64 2101.502 GRUBBING EACH 41
65 2104.502 REMOVE CASTING EACH 19
66 2104.502 REMOVE DRAINAGE STRUCTURE EACH 13
67 2104.503 REMOVE WOOD FENCE L F 65
68 2104.503 REMOVE SEWER PIPE (STORM) L F 385
69 2104.503 REMOVE WOOD RETAINING WALL L F 65
70 2106.601 DEWATERING LS 1
71 2106.607 EXCAVATION - CHANNEL AND POND (LV) CY 571
72 2106.607 EXCAVATION - CHANNEL AND POND (LV) (SPECIAL) CY 280
73 2411.502 CONCRETE HEADWALL EACH 1
74 2502.503 6" PERF TP PIPE DRAIN L F 597
75 2502.602 6" TP PIPE DRAIN CLEAN OUT EACH 3
76 2503.503 12" RC PIPE SEWER CLASS V L F 474
77 2503.503 15" RC PIPE SEWER CLASS V L F 149
78 2503.503 18" RC PIPE SEWER CLASS V L F 86
79 2503.503 21" RC PIPE SEWER CLASS III L F 8
80 2503.503 24" RC PIPE SEWER CLASS III L F 73
81 2503.503 48" RC PIPE SEWER CLASS III L F 30
82 2503.602 CONNECT INTO EXISTING DRAINAGE STRUCTURE EACH 8
83 2503.603 CLEAN PIPE SEWER L F 3
84 2503.603 PLUG FILL & ABANDON PIPE SEWER L F 47
85 2503.603 TRENCH DRAIN L F 31
86 2506.502 ADJUST FRAME & RING CASTING EACH 49
87 2506.502 CASTING ASSEMBLY EACH 44
88 2506.503 CONST DRAINAGE STRUCTURE DES 48-4020 L F 53
89 2506.503 CONST DRAINAGE STRUCTURE DES 60-4020 L F 24
90 2506.602 6" TOP SLAB FOR 48-4020 STRUCTURE EACH 6
91 2506.602 CHIMNEY SEAL EACH 68
92 2506.602 CONST DRAINAGE STRUCTURE DESIGN SPEC (2'X3') EACH 14
93 2506.602 CONST DRAINAGE STRUCTURE DESIGN SPEC 3 EACH 2
94 2506.602 FILL STRUCTURE SUMP EACH 22
95 2506.602 GROUT CATCH BASIN OR MANHOLE EACH 33
96 2506.602 REMOVE DRAINAGE STRUCTURE SPECIAL (TRASH GUARD) EACH 7
97 2511.507 GROUTED RIPRAP C Y 17
98 2511.507 RANDOM RIPRAP CLASS III C Y 7
99 2573.501 STORM DRAIN INLET PROTECTION EACH 84
24-02 2024 Street Reconstruction Project - Schedule C: Watermain Improvements
100 2021.501 MOBILIZATION LS 1
101 2104.502 REMOVE GATE VALVE EACH 2
102 2104.502 REMOVE HYDRANT EACH 3
103 2104.502 REMOVE VALVE BOX EACH 3
104 2104.503 REMOVE WATER MAIN L F 8
105 2105.610 EXPLORATORY EXCAVATION HOUR 10
106 2106.601 DEWATERING LS 1
107 2451.609 GRANULAR FOUNDATION AND/OR BEDDING TON 200
108 2504.602 6" GATE VALVE & BOX EACH 2
109 2504.602 8" GATE VALVE & BOX EACH 1
110 2504.602 ADJUST VALVE BOX EACH 12
111 2504.602 BOLT & VALVE BOX REPLACEMENT - HYDRANT & HYDRANT VALVE EACH 10
112 2504.602 BOLT & VALVE BOX REPLACEMENT - VALVE EACH 13
113 2504.602 HYDRANT EACH 3
114 2504.602 INSTALL HYDRANT LEAD RESTRAINT EACH 3
115 2504.602 METER BOX COVER EACH 5
116 2504.602 VALVE BOX SECTION EACH 5
117 2504.603 6" WATERMAIN DUCTILE IRON CL 52 L F 10
118 2504.603 8" WATERMAIN DUCTILE IRON CL 52 L F 8
119 2504.604 4" POLYSTYRENE INSULATION S Y 60
120 2504.608 DUCTILE IRON FITTINGS LB 700
24-02 2024 Street Reconstruction Project - Schedule D: Sanitary Sewer Improvements
121 2021.501 MOBILIZATION LS 1
122 2104.502 REMOVE CASTING EACH 3
123 2506.502 CASTING ASSEMBLY EACH 3
124 2506.502 ADJUST FRAME & RING CASTING EACH 58
125 2506.503 RECONSTRUCT DRAINAGE STRUCTURE L F 1
126 2506.602 CHIMNEY SEAL EACH 61
127 2506.602 GROUT MANHOLE (SANITARY) EACH 7
24-02 2024 Street Reconstruction Project - Schedule E: Water Quality Improvements
128 2021.501 MOBILIZATION LS 1
129 2503.503 15" RC PIPE SEWER CLASS V L F 30
130 2503.503 48" RC PIPE SEWER CLASS III L F 34
131 2506.502 CONST DRAINAGE STRUCTURE DESIGN SPEC 1 EACH 1
132 2506.502 CONST DRAINAGE STRUCTURE DESIGN SPEC 2 EACH 1
133 2506.502 CONST DRAINAGE STRUCTURE DES 72-4020 EACH 1
134 2506.502 CONST DRAINAGE STRUCTURE DES 84-4020 EACH 1
24-02 2024 Street Rehabilitation Project - Schedule F: Street Improvements
135 2021.501 MOBILIZATION LS 1
136 2101.505 CLEARING ACRE 0.12
137 2101.505 GRUBBING ACRE 0.12
138 2104.502 SALVAGE MAIL BOX SUPPORT EACH 12
139 2104.503 SAWING CONCRETE PAVEMENT (FULL DEPTH) L F 331
140 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) L F 581
141 2104.503 REMOVE CURB & GUTTER L F 4,232
142 2104.504 REMOVE CONCRETE DRIVEWAY PAVEMENT S Y 200
143 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT S Y 286
144 2104.504 REMOVE BITUMINOUS PAVEMENT S Y 56
145 2104.504 REMOVE BITUMINOUS WALK S Y 641
146 2104.518 REMOVE CONCRETE WALK S F 564
147 2104.601 SALVAGE AND REINSTALL LANDSCAPE STRUCTURES LS 1
148 2106.507 EXCAVATION - SUBGRADE C Y 791
149 2106.507 STABILIZING AGGREGATE (CV) C Y 791
150 2106.509 STABILIZING AGGREGATE TON 12
151 2118.509 AGGREGATE SURFACING CLASS 2 TON 77
152 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 50
153 2130.523 WATER MGAL 238
154 2211.509 AGGREGATE BASE (CV) CLASS 5 TON 16
155 2231.609 BITUMINOUS PATCH SPECIAL TON 867
156 2232.504 MILL BITUMINOUS SURFACE (2.0") S Y 33,643
157 2232.504 MILL BITUMINOUS SURFACE (VARIABLE DEPTH) S Y 13,398
158 2360.504 TYPE SP 9.5 WEAR CRS MIX(2,B)3.0" THICK S Y 884
159 2360.509 TYPE SP 9.5 WEARING COURSE MIX (3,B) TON 5,582
160 2360.509 TYPE SP 12.5 NON WEAR COURSE MIX (3,C) TON 7
161 2504.601 IRRIGATION SYSTEM REPAIR LS 1
162 2521.518 5" CONCRETE WALK S F 115
163 2521.518 6" CONCRETE WALK S F 793
164 2531.503 CONCRETE CURB & GUTTER DESIGN B618 L F 741
165 2531.503 CONCRETE CURB & GUTTER DESIGN D412 L F 3,158
166 2531.504 7" CONCRETE DRIVEWAY PAVEMENT S Y 181
167 2531.604 7" CONCRETE DRIVEWAY PAVEMENT SPECIAL S Y 60
168 2531.618 TRUNCATED DOMES S F 113
169 2540.602 MAIL BOX EACH 12
170 2540.602 MAIL BOX SUPPORT EACH 12
171 2540.602 TEMPORARY MAIL BOX EACH 113
172 2563.601 TRAFFIC CONTROL LS 1
173 2571.502 DECIDUOUS SHRUB SPECIAL EACH 4
174 2571.502 DECIDUOUS TREE 2" CAL B&B EACH 4
175 2573.501 STABILIZED CONSTRUCTION EXIT LS 1
176 2573.503 SEDIMENT CONTROL LOG TYPE STRAW L F 715
177 2575.504 RAPID STABILIZATION METHOD 4 S Y 350
178 2575.504 ROLLED EROSION PREVENTION CATEGORY 25 S Y 959
179 2575.523 WATER MGAL 50
180 2575.604 PERMANENT TURF ESTABLISHMENT S Y 745
181 2575.604 TEMPORARY STABILIZATION S Y 745
182 2582.503 4" DBLE SOLID LINE PAINT L F 2,352
183 2582.503 4" SOLID LINE PAINT L F 4,480
184 2582.503 24" SOLID LINE PAINT L F 25
185 2582.518 PAVT MSSG PAINT S F 41
24-02 2024 Street Rehabilitation Project - Schedule G: Storm Sewer Improvements
186 2021.501 MOBILIZATION LS 1
187 2101.502 CLEARING EACH 19
188 2101.502 GRUBBING EACH 19
189 2104.502 REMOVE CASTING EACH 1
190 2104.502 REMOVE DRAINAGE STRUCTURE EACH 2
191 2104.502 REMOVE PIPE APRON EACH 2
192 2104.503 REMOVE SEWER PIPE (STORM) L F 40
193 2106.601 DEWATERING LS 1
194 2106.607 EXCAVATION - CHANNEL AND POND (LV) CY 20
195 2106.607 EXCAVATION - CHANNEL AND POND (LV) (SPECIAL) CY 10
196 2501.502 36" RC PIPE APRON EACH 2
197 2501.503 36" RC PIPE CULVERT L F 48
198 2503.503 12" RC PIPE SEWER DES 3006 CL V L F 26
199 2503.503 18" RC PIPE SEWER DES 3006 CL V L F 32
200 2503.602 CONNECT INTO EXISTING DRAINAGE STRUCTURE EACH 3
201 2506.502 ADJUST FRAME & RING CASTING EACH 67
202 2506.502 CASTING ASSEMBLY EACH 6
203 2506.503 CONST DRAINAGE STRUCTURE DES 48-4020 L F 12
204 2506.602 6" TOP SLAB FOR 48-4020 STRUCTURE EACH 5
205 2506.602 CHIMNEY SEAL EACH 8
206 2506.602 CONST DRAINAGE STRUCTURE DESIGN SPEC (2'X3') EACH 3
207 2506.602 FILL STRUCTURE SUMP EACH 47
208 2506.602 GROUT CATCH BASIN OR MANHOLE EACH 42
209 2506.602 REMOVE DRAINAGE STRUCTURE SPECIAL (TRASH GUARD) EACH 8
210 2511.507 RANDOM RIPRAP CLASS III C Y 16
211 2573.502 STORM DRAIN INLET PROTECTION EACH 81
24-02 2024 Street Rehabilitation Project - Schedule H: Sanitary Sewer Improvements
212 2021.501 MOBILIZATION LS 1
213 2104.502 REMOVE CASTING EACH 2
214 2506.502 ADJUST FRAME & RING CASTING EACH 57
215 2506.502 CASTING ASSEMBLY EACH 2
216 2506.602 CHIMNEY SEAL EACH 57
24-02 2024 Street Rehabilitation Project - Schedule I: Watermain Improvements
217 2021.501 MOBILIZATION LS 1
218 2104.502 REMOVE VALVE BOX EACH 7
219 2106.61 EXPLORATORY EXCAVATION HOUR 15
220 2451.609 GRANULAR FOUNDATION AND/OR BEDDING TON 400
221 2504.602 ADJUST VALVE BOX EACH 11
222 2504.602 BOLT & VALVE BOX REPLACEMENT - HYDRANT & HYDRANT VALVE EACH 24
223 2504.602 BOLT & VALVE BOX REPLACEMENT - VALVE EACH 19
224 2504.602 6" GATE VALVE EACH 2
225 2504.602 8" GATE VALVE EACH 2
226 2504.602 HYDRANT EACH 2
227 2504.602 INSTALL HYDRANT LEAD RESTRAINT EACH 2
228 2504.602 METER BOX COVER EACH 3
229 2504.602 VALVE BOX SECTION EACH 34
230 2504.604 4" POLYSTYRENE INSULATION S Y 40
231 2504.608 DUCTILE IRON FITTINGS LB 300