Project Items

Line Item Number Description Units Quantity
1 2011.601 AS BUILT LUMP SUM 1
2 2016.609 QUALITY MANAGEMENT - E-TICKETING TON 12,072
3 2021.501 MOBILIZATION LUMP SUM 1
4 2031.502 FIELD OFFICE EACH 1
5 2041.61 TRAINEES HOUR 1,500
6 2101.502 GRUBBING EACH 7
7 2101.505 GRUBBING ACRE 13.5
8 2104.502 REMOVE PIPE APRON EACH 1
9 2104.502 REMOVE BASEMENT EACH 1
10 2104.502 REMOVE SIGN EACH 5
11 2104.502 REMOVE MAIL BOX SUPPORT EACH 1
12 2104.502 SALVAGE MAIL BOX SUPPORT EACH 8
13 2104.502 ABANDON WELL EACH 1
14 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 261
15 2104.503 REMOVE PIPE CULVERTS LIN FT 104
16 2104.503 REMOVE SEWER PIPE (SANITARY) LIN FT 150
17 2104.503 REMOVE CHAIN LINK FENCE LIN FT 253
18 2104.503 REMOVE WOOD FENCE LIN FT 2,531
19 2104.504 REMOVE BITUMINOUS PAVEMENT SQ YD 8,397
20 2106.507 EXCAVATION - COMMON (P) CU YD 62,817
21 2106.507 EXCAVATION - MUCK (P) CU YD 5,060
22 2106.507 EXCAVATION - CHANNEL AND POND (P) CU YD 5,052
23 2106.507 SELECT GRANULAR EMBANKMENT (CV) (P) CU YD 28,793
24 2106.507 COMMON EMBANKMENT (CV) (P) CU YD 32,657
25 2106.602 SETTLEMENT PLATES EACH 12
26 2108.504 GEOTEXTILE FABRIC TYPE 4 SQ YD 7,429
27 2118.507 AGGREGATE SURFACING (CV) CLASS 1 (P) CU YD 173
28 2123.61 STREET SWEEPER (WITH PICKUP BROOM) HOUR 40
29 2211.507 AGGREGATE BASE (CV) CLASS 5 (P) CU YD 5,994
30 2232.504 MILL BITUMINOUS SURFACE (2.0") SQ YD 54,300
31 2360.509 TYPE SP 12.5 WEARING COURSE MIXTURE (2,B) TON 7,238
32 2360.509 TYPE SP 12.5 WEARING COURSE MIXTURE (3,C) TON 4,834
33 2401.503 TYPE P-1 BARRIER CONCRETE (3S52) (P) LIN FT 158
34 2401.503 TYPE P-2 (TL-4) BARRIER CONCRETE (3S52) (P) LIN FT 158
35 2401.507 STRUCTURAL CONCRETE (3B52) (P) CU YD 114
36 2401.508 REINFORCEMENT BARS (EPOXY COATED) (P) POUND 122,910
37 2401.508 REINFORCEMENT BARS (STAINLESS-75KSI) (P) POUND 580
38 2401.518 SIDEWALK CONCRETE (3S52) (P) SQ FT 2,075
39 2401.601 STRUCTURE EXCAVATION LUMP SUM 1
40 2401.601 FOUNDATION PREP PILE BENT PIERS LUMP SUM 1
41 2401.607 BRIDGE SLAB CONCRETE (3YHPC-M) (P) CU YD 480
42 2406.503 EXPANSION JOINTS, DESIGN E8 LIN FT 104
43 2406.504 BRIDGE APPROACH PANELS SQ YD 221
44 2451.507 FINE AGGREGATE BEDDING (CV) CU YD 202
45 2451.607 STRUCTURAL BACKFILL CU YD 556
46 2452.502 C-I-P CONCRETE TEST PILE 85 FT LONG 12" EACH 2
47 2452.502 C-I-P CONCRETE TEST PILE 95 FT LONG 12" EACH 2
48 2452.502 C-I-P CONCRETE TEST PILE 90 FT LONG 16" EACH 2
49 2452.502 C-I-P CONCRETE TEST PILE 100 FT LONG 16" EACH 2
50 2452.502 PILE REDRIVING EACH 8
51 2452.502 PILE ANALYSIS EACH 8
52 2452.603 C-I-P CONCRETE PILING 12" LIN FT 800
53 2452.603 C-I-P CONCRETE PILING 16" LIN FT 850
54 2475.503 STRUCTURAL TUBE RAILING DESIGN T-1 PC (P) LIN FT 152
55 2475.503 ORNAMENTAL METAL RAILING DESIGN T-4 PC (P) LIN FT 158
56 2501.502 15" RC PIPE APRON EACH 5
57 2501.502 18" RC PIPE APRON EACH 3
58 2501.502 24" RC PIPE APRON EACH 6
59 2501.502 12" RC SAFETY APRON EACH 1
60 2501.503 24" RC PIPE CULVERT LIN FT 254
61 2502.501 DRAINAGE SYSTEM TYPE (B910) LUMP SUM 1
62 2502.503 4" PERF TP PIPE DRAIN LIN FT 1,712
63 2503.503 15" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT 1,405
64 2503.503 18" RC PIPE SEWER DESIGN 3006 LIN FT 240
65 2503.602 CONNECT TO EXISTING SANITARY SEWER EACH 1
66 2503.602 CONNECT TO EXISTING MANHOLES (SAN) EACH 1
67 2503.603 12" PIPE SEWER LIN FT 310
68 2506.502 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL EACH 1
69 2506.502 CASTING ASSEMBLY EACH 35
70 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN H LIN FT 46.8
71 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 LIN FT 103
72 2506.602 RECONSTRUCT DRAINAGE STRUCTURE SPECIAL EACH 1
73 2511.504 GEOTEXTILE FILTER TYPE 3 SQ YD 590
74 2511.504 GEOTEXTILE FILTER TYPE 4 SQ YD 101
75 2511.507 RANDOM RIPRAP CLASS II CU YD 224
76 2511.507 RANDOM RIPRAP CLASS III CU YD 25
77 2521.518 4" CONCRETE WALK SQ FT 9,366
78 2521.518 6" CONCRETE WALK SQ FT 7,536
79 2521.602 DRILL AND GROUT REINF BAR (EPOXY COATED) EACH 768
80 2531.503 CONCRETE CURB AND GUTTER DESIGN B624 LIN FT 5,064
81 2531.503 CONCRETE CURB AND GUTTER DESIGN R424 LIN FT 810
82 2531.503 CONCRETE CURB AND GUTTER DESIGN S524 LIN FT 5,320
83 2531.504 8" CONCRETE DRIVEWAY PAVEMENT SQ YD 710
84 2531.618 TRUNCATED DOMES SQ FT 779
85 2540.602 INSTALL MAIL BOX SUPPORT EACH 8
86 2545.501 LIGHTING SYSTEM "A" LUMP SUM 1
87 2545.501 LIGHTING SYSTEM "B" LUMP SUM 1
88 2554.502 GUIDE POST TYPE B EACH 14
89 2563.601 TRAFFIC CONTROL LUMP SUM 1
90 2564.618 SIGN SQ FT 534
91 2573.501 STABILIZED CONSTRUCTION EXIT LUMP SUM 1
92 2573.501 EROSION CONTROL SUPERVISOR LUMP SUM 1
93 2573.502 STORM DRAIN INLET PROTECTION EACH 35
94 2573.502 CULVERT END CONTROLS EACH 9
95 2573.503 SILT FENCE, TYPE MS LIN FT 12,745
96 2573.503 SEDIMENT CONTROL LOG TYPE COMPOST LIN FT 8,859
97 2574.505 SUBSOILING (P) ACRE 1.1
98 2574.505 SOIL BED PREPARATION (P) ACRE 13.9
99 2574.508 FERTILIZER TYPE 1 POUND 2,843
100 2574.508 FERTILIZER TYPE 3 POUND 2,956
101 2574.508 FERTILIZER TYPE 4 POUND 144
102 2575.504 RAPID STABILIZATION METHOD 4 SQ YD 23,766
103 2575.504 ROLLED EROSION PREVENTION CATEGORY 25 SQ YD 12,729
104 2575.505 SEEDING (P) ACRE 13.9
105 2575.505 MOWING (P) ACRE 27.8
106 2575.505 WEED SPRAYING (P) ACRE 7
107 2575.506 WEED SPRAY MIXTURE GALLON 4
108 2575.508 SEED MIXTURE 21-111 POUND 207
109 2575.508 SEED MIXTURE 25-121 POUND 98
110 2575.508 SEED MIXTURE 25-131 POUND 303
111 2575.508 SEED MIXTURE 32-241 POUND 281
112 2575.508 SEED MIXTURE 33-361 POUND 43
113 2575.508 SEED MIXTURE 35-221 POUND 354
114 2575.508 HYDRAULIC REINFORCED FIBER MATRIX POUND 43,393
115 2575.508 HYDRAULIC STABILIZED FIBER MATRIX POUND 42,622
116 2582.503 4" SOLID LINE MULTI-COMPONENT GROUND IN (WR) LIN FT 41,161
117 2582.503 24" SOLID LINE MULTI-COMPONENT GROUND IN (WR) LIN FT 278
118 2582.503 4" DOUBLE SOLID LINE MULTI-COMPONENT GROUND IN (WR) LIN FT 18,356
119 2582.503 12" DOTTED LINE PREFORM THERMO GROUND IN LIN FT 144
120 2582.518 CROSSWALK PREFORM THERMOPLASTIC GROUND IN SQ FT 960