1 2021.501 MOBILIZATION LUMP SUM 1
2 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 20
3 2355.506 BITUMINOUS MATERIAL FOR FOG SEAL GALLON 74,638
4 2356.504 BITUMINOUS SEAL COAT (FA 2) SQ YD 5,400
5 2356.504 BITUMINOUS SEAL COAT (FA 2 1/2) SQ YD 1,017,747
6 2356.506 BITUMINOUS MATERIAL FOR SEAL COAT GALLON 363,055
7 2563.601 TRAFFIC CONTROL LUMP SUM 1
8 2580.503 INTERIM PAVEMENT MARKING LIN FT 313,831
9 2582.503 4" SOLID LINE PAINT LIN FT 595,432
10 2582.503 24" SOLID LINE PAINT LIN FT 542
11 2582.503 4" BROKEN LINE PAINT LIN FT 30,078
12 2582.503 8" DOTTED LINE PAINT LIN FT 464
13 2582.503 4" DOUBLE SOLID LINE PAINT L F 121,892
14 2582.518 PAVEMENT MESSAGE PAINT S F 548