Line | Item Number | Description | Units | Quantity |
---|---|---|---|---|
1 | 2021.501/00010 | MOBILIZATION | LUMP SUM | 1 |
2 | 2104.503/00190 | SAWING CONCRETE PAVEMENT | L F | 50 |
3 | 2104.503/00200 | SAWING BITUMINOUS PAVEMENT | L F | 1,150 |
4 | 2104.503/00325 | REMOVE CONCRETE CURB | L F | 1,000 |
5 | 2104.518/00140 | REMOVE CONCRETE WALK | S F | 4,500 |
6 | 2104.518/00160 | REMOVE CONCRETE DRIVEWAY PAVEMENT | S F | 300 |
7 | 2104.518/00250 | REMOVE BITUMINOUS PAVEMENT | S F | 1,875 |
8 | 2105.501 | COMMON EXCAVATION | C Y | 25 |
9 | 2211.509/00070 | AGGREGATE BASE CLASS 5 | TON | 60 |
10 | 2301.504/00080 | CONCRETE PAVEMENT 8.0" | S Y | 35 |
11 | 2301.602/00016 | DRILL & GROUT DOWEL BAR (EPOXY COATED) | EACH | 256 |
12 | 2360.509/10100 | TYPE SP 9.5 BIT MIXTURE FOR PATCHING | TON | 100 |
13 | 2504.602 | ADJUST GATE VALVE | EACH | 2 |
14 | 2504.602/03005 | ADJUST CURB STOP | EACH | 2 |
15 | 2506.502/06020 | ADJUST FRAME & RING CASTING | EACH | 2 |
16 | 2506.502/66002 | CASTING ASSEMBLY (TYPE A-1) | EACH | 2 |
17 | 2521.518/00040 | 4" CONCRETE WALK | S F | 4,975 |
18 | 2521.518/00060 | 6" CONCRETE WALK | S F | 2,000 |
19 | 2531.503/02315 | CONCRETE CURB & GUTTER DESIGN B618 | L F | 1,000 |
20 | 2531.618/00010 | TRUNCATED DOMES | S F | 424 |
21 | 2563.601/00010 | TRAFFIC CONTROL | LS | 1 |
22 | 2575.623/60100 | HYDRO-SEEDING W/4" TOPSOIL | S Y | 475 |