bidVAULT

Welcome, Guest!
Log in | Project Owner Login | Privacy Policy | Disclaimer | Official bid entry time: 05/04/2024 9:34 PM CDT | rss feed icon | calendar icon
 

Project Items

Line Item Number Description Units Quantity
1 2104.502 SALVAGE CONCRETE APRON EACH 6
2 2104.503 SAWING BIT PAVEMENT (FULL DEPTH) LF 170
4 2104.503 SALVAGE FENCE L F 200
5 2104.507 REMOVE AGGREGATE CU YD 9,439
7 2112.603 SHOULDER PREPARATION LIN FT 47,880
9 2118.509 AGGREGATE SURFACING CLASS 1 TON 937
11 2123.510 DOZER HOUR 3
13 2123.510 MOTOR GRADER HOUR 3
15 2123.610 SKID LOADER HOUR 8
17 2211.509 AGGREGATE BASE CLASS 5 TON 200
19 2215.504 FULL DEPTH RECLAMATION (P) S Y 85,045
21 2232.504 MILL BITUMINOUS SURFACE S Y 54
23 2232.603 MILLED RUMBLE STRIPS-INTERMITTENT L F 4,500
24 2360.509 TYPE SP 9.5 WEARING COURSE MIX (3,C) TON 8,068
26 2360.509 TYPE SP 12.5 WEARING COURSE MIX (3,C) TON 11,432
28 2501.502 INSTALL CONCRETE APRON EACH 6
29 2540.602 MAIL BOX SUPPORT EACH 1
30 2540.602 RELOCATE MAIL BOX SUPPORT EACH 40
32 2557.603 INSTALL FENCE LIN FT 200
33 2563.601 TRAFFIC CONTROL LUMP SUM 1
35 2563.602 RAISED PAVEMENT MARKER TEMPORARY EACH 382
37 2574.508 FERTILIZER TYPE 2 LB 590
39 2574.609 COMMON TOPSOIL BORROW TON 1,600
41 2575.505 SEEDING ACRE 2.95
43 2575.508 SEED MIXTURE 21-111 LB 89.98
45 2575.508 SEED MIXTURE 25-131 LB 649
47 2575.508 HYDRAULIC BONDED FIBER MATRIX LB 10,325
49 2580.503 INTERIM PAVEMENT MARKING L F 2,184
51 2582.503 4" BROKEN LINE MULTI COMP LIN FT 5,472
53 2582.503 4" SOLID LINE MULTI COMP LIN FT 22,803
54 2582.503 6" SOLID LINE MULTI COMP LIN FT 54,634
56 2582.503 24" SOLID LINE PREF TAPE GR IN L F 24
57 2582.518 PAVT MSSG PREF TAPE GR IN S F 49.86