Line |
Item Number |
Description |
Units |
Quantity |
1 |
2021.501/00010 |
MOBILIZATION (P) |
LS |
1 |
2 |
2104.502 |
REMOVE WOOD POST |
EACH |
173 |
3 |
2104.503/00205 |
SAWING BIT PAVEMENT (FULL DEPTH) |
L F |
31 |
4 |
2104.503/00315 |
REMOVE CURB & GUTTER |
L F |
20 |
5 |
2104.504/00130 |
REMOVE BITUMINOUS SURFACING |
S Y |
35 |
6 |
2104.518/00080 |
REMOVE SIDEWALK |
S F |
20 |
7 |
2106.607 |
COMMON EXCAVATION (P) |
CU YD |
590 |
8 |
2108.504 |
GEOTEXTILE FABRIC, TYPE 7 |
S Y |
1,997 |
9 |
2211.607 |
AGGREGATE BASE (CV) CLASS 5 (P) |
CU YD |
335 |
10 |
2301.501 |
CONCRETE PUMPING TRUCK |
L S |
1 |
11 |
2502.503 |
4" PERF PVC PIPE DRAIN |
L F |
220 |
12 |
2503.602 |
CONNECT TO EXISTING STORM SEWER |
EACH |
1 |
13 |
2503.603 |
12" PIPE SEWER |
L F |
203 |
14 |
2506.502/00010 |
CONST DRAINAGE STRUCTURE DESIGN A |
EACH |
2 |
15 |
2506.503 |
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48-4020 |
LIN FT |
7.1 |
16 |
2521.518/00040 |
4" CONCRETE WALK |
S F |
50 |
17 |
2531.503 |
CONCRETE CURB AND GUTTER DESIGN B618 |
LF |
1,110 |
18 |
2531.504 |
6" CONCRETE DRIVEWAY PAVEMENT |
S Y |
36 |
19 |
2531.507/001 |
6" CONCRETE PARKING LOT PAVEMENT |
SY |
1,657 |
20 |
2573.501/00025 |
STABILIZED CONSTRUCTION EXIT |
LS |
1 |
21 |
2573.502/00110 |
STORM DRAIN INLET PROTECTION |
EACH |
3 |
22 |
2574.507/00104 |
BOULEVARD TOPSOIL BORROW |
C Y |
140 |
23 |
2575.601 |
TURF ESTABLISHMENT |
LS |
1 |
24 |
2575.623 |
RAPID STABILIZATION METHOD 3 |
MGAL |
3 |
25 |
2582.503 |
4" SOLID LINE PAINT |
L F |
530 |
26 |
2582.518 |
PAVEMENT MESSAGE PAINT |
EACH |
1 |