bidVAULT

Welcome, Guest!
Log in | Project Owner Login | Privacy Policy | Disclaimer | Official bid entry time: 05/02/2024 4:44 PM CDT | rss feed icon | calendar icon
 

Project Items

Line Item Number Description Units Quantity
1 2021.501 MOBILIZATION LUMP SUM 1
2 2101.501 CLEARING AND GRUBBING LUMP SUM 1
3 2104.503 REMOVE PIPE CULVERTS LIN FT 974
4 2104.503 SAWING BITUMINOUS PAVEMENT LIN FT 16
5 2104.504 REMOVE BITUMINOUS PAVEMENT SQ YD 30
6 2106.507 EXCAVATION - SUBGRADE (P) CU YD 24,197
7 2106.507 EXCAVATION - COMMON (P) CU YD 15,794
8 2106.507 SELECT GRANULAR EMBANKMENT (CV) (P) CU YD 10,370
9 2106.507 COMMON EMBANKMENT (CV) (P) CU YD 21,019
10 2108.504 GEOGRID TYPE 1 SQ YD 29,259
11 2123.510 3.0 CU YD SHOVEL HOUR 10
12 2123.510 DOZER HOUR 10
13 2211.509 AGGREGATE BASE CLASS 5 MODIFIED TONS 30,290
14 2451.507 STRUCTURE EXCAVATION, CLASS U (P) CU YD 1,232
15 2451.507 GRANULAR BEDDING (CV) (P) CU YD 78
16 2501.502 24" RC PIPE APRON EACH 6
17 2501.502 36" SPAN RC PIPE-ARCH APRON EACH 2
18 2501.502 18" GS PIPE APRON EACH 44
19 2501.502 24" GS PIPE APRON EACH 8
20 2501.503 24" RC PIPE CULVERT CLASS II LIN FT 140
21 2501.503 36" SPAN RC PIPE-ARCH CULVERT CLASS IIA LIN FT 48
22 2501.503 18" CS PIPE CULVERT LIN FT 976
23 2501.503 24" CS PIPE CULVERT LIN FT 180
24 2501.503 18" CS PIPE CULVERT ELBOW EACH 2
25 2540.602 MAIL BOX SUPPORT EACH 29
26 2511.507 RANDOM RIPRAP CLASS III CU YD 10
27 2563.601 TRAFFIC CONTROL LUMP SUM 1
28 2573.503 SILT FENCE, TYPE PA LIN FT 105
29 2574.508 FERTILIZER, TYPE 1 POUND 2,951
30 2575.504 EROSION CONTROL BLANKETS (CATEGORY 3N) SQ YD 174
31 2575.505 SEEDING ACRE 9.97
32 2575.508 SEED MIXTURE 21-111 POUND 203
33 2575.508 SEED MIXTURE 25-121 POUND 412
34 2575.508 SEED MIXTURE 25-131 POUND 708
35 2575.508 HYRAULIC BONDED FIBER MATRIX POUND 10,626
36 2575.509 MULCH MATERIAL, TYPE 1 TON 10.13