Line |
Item Number |
Description |
Units |
Quantity |
1 |
2021.501 |
MOBILIZATION |
LUMP SUM |
1 |
2 |
2101.501 |
CLEARING AND GRUBBING |
LUMP SUM |
1 |
3 |
2104.503 |
REMOVE PIPE CULVERTS |
LIN FT |
974 |
4 |
2104.503 |
SAWING BITUMINOUS PAVEMENT |
LIN FT |
16 |
5 |
2104.504 |
REMOVE BITUMINOUS PAVEMENT |
SQ YD |
30 |
6 |
2106.507 |
EXCAVATION - SUBGRADE (P) |
CU YD |
24,197 |
7 |
2106.507 |
EXCAVATION - COMMON (P) |
CU YD |
15,794 |
8 |
2106.507 |
SELECT GRANULAR EMBANKMENT (CV) (P) |
CU YD |
10,370 |
9 |
2106.507 |
COMMON EMBANKMENT (CV) (P) |
CU YD |
21,019 |
10 |
2108.504 |
GEOGRID TYPE 1 |
SQ YD |
29,259 |
11 |
2123.510 |
3.0 CU YD SHOVEL |
HOUR |
10 |
12 |
2123.510 |
DOZER |
HOUR |
10 |
13 |
2211.509 |
AGGREGATE BASE CLASS 5 MODIFIED |
TONS |
30,290 |
14 |
2451.507 |
STRUCTURE EXCAVATION, CLASS U (P) |
CU YD |
1,232 |
15 |
2451.507 |
GRANULAR BEDDING (CV) (P) |
CU YD |
78 |
16 |
2501.502 |
24" RC PIPE APRON |
EACH |
6 |
17 |
2501.502 |
36" SPAN RC PIPE-ARCH APRON |
EACH |
2 |
18 |
2501.502 |
18" GS PIPE APRON |
EACH |
44 |
19 |
2501.502 |
24" GS PIPE APRON |
EACH |
8 |
20 |
2501.503 |
24" RC PIPE CULVERT CLASS II |
LIN FT |
140 |
21 |
2501.503 |
36" SPAN RC PIPE-ARCH CULVERT CLASS IIA |
LIN FT |
48 |
22 |
2501.503 |
18" CS PIPE CULVERT |
LIN FT |
976 |
23 |
2501.503 |
24" CS PIPE CULVERT |
LIN FT |
180 |
24 |
2501.503 |
18" CS PIPE CULVERT ELBOW |
EACH |
2 |
25 |
2540.602 |
MAIL BOX SUPPORT |
EACH |
29 |
26 |
2511.507 |
RANDOM RIPRAP CLASS III |
CU YD |
10 |
27 |
2563.601 |
TRAFFIC CONTROL |
LUMP SUM |
1 |
28 |
2573.503 |
SILT FENCE, TYPE PA |
LIN FT |
105 |
29 |
2574.508 |
FERTILIZER, TYPE 1 |
POUND |
2,951 |
30 |
2575.504 |
EROSION CONTROL BLANKETS (CATEGORY 3N) |
SQ YD |
174 |
31 |
2575.505 |
SEEDING |
ACRE |
9.97 |
32 |
2575.508 |
SEED MIXTURE 21-111 |
POUND |
203 |
33 |
2575.508 |
SEED MIXTURE 25-121 |
POUND |
412 |
34 |
2575.508 |
SEED MIXTURE 25-131 |
POUND |
708 |
35 |
2575.508 |
HYRAULIC BONDED FIBER MATRIX |
POUND |
10,626 |
36 |
2575.509 |
MULCH MATERIAL, TYPE 1 |
TON |
10.13 |