bidVAULT

Welcome, Guest!
Log in | Project Owner Login | Privacy Policy | Disclaimer | Official bid entry time: 05/02/2024 4:24 AM CDT | rss feed icon | calendar icon
 

Project Items

Line Item Number Description Units Quantity
1 2016.609 QUALITY MANAGEMENT - E-TICKETING TON 36,138
2 2021.501 MOBILIZATION LS 1
3 2104.502 REMOVE PIPE APRON EACH 2
4 2104.502 REMOVE SIGN EACH 1
5 2104.502 SALVAGE SIGN EACH 20
6 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) L F 4,970
7 2104.503 REMOVE PIPE CULVERTS L F 194
8 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT S Y 268
9 2104.504 REMOVE BITUMINOUS PAVEMENT S Y 15,011
10 2106.507 EXCAVATION - COMMON C Y 1,349
11 2106.507 SELECT GRANULAR EMBANKMENT (CV) C Y 417
12 2112.519 SUBGRADE PREPARATION RDST 48
13 2118.509 AGGREGATE SURFACING CLASS 1 TON 390
14 2118.609 AGGREGATE SURFACING SPECIAL TON 1,183
15 2211.507 AGGREGATE BASE (CV) CLASS 5 C Y 2,148
16 2211.509 AGGREGATE BASE CLASS 5 TON 1,979
17 2221.509 SHOULDER BASE AGGREGATE CLASS 5 TON 725
18 2232.504 MILL BITUMINOUS SURFACE (2.0") S Y 5,087
19 2232.504 MILL BITUMINOUS SURFACE (3.0") S Y 88,133
20 2232.603 MILLED SINUSOIDAL RUMBLE STRIPS-CL L F 34,926
21 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GAL 19,026
22 2357.606 BITUMINOUS MATERIAL FOR SHOULDER TACK GAL 3,894
23 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (3,B) TON 15,590
24 2360.509 TYPE SP 12.5 WEARING COURSE MIXTURE (3,B) TON 17,916
25 2360.509 TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,B) TON 2,632
26 2501.502 15" CAS PIPE APRON EACH 4
27 2501.502 24" CAS PIPE APRON EACH 2
28 2501.502 24" RC PIPE APRON EACH 4
29 2501.503 15" CAS PIPE CULVERT L F 112
30 2501.503 24" RC PIPE CULVERT L F 124
31 2501.603 CLEAN PIPE CULVERT L F 295
32 2507.603 LINING CULVERT PIPE (24") SPECIAL L F 85
33 2540.602 MAIL BOX SUPPORT EACH 25
34 2540.602 RELOCATE MAIL BOX SUPPORT EACH 41
35 2563.601 TRAFFIC CONTROL LS 1
36 2564.602 INSTALL SIGN EACH 20
37 2564.618 SIGN S F 108
38 2573.501 EROSION CONTROL SUPERVISOR LS 1
39 2573.503 SILT FENCE, TYPE MS L F 2,640
40 2573.503 SEDIMENT CONTROL LOG TYPE WOOD CHIP L F 1,600
41 2574.505 SOIL BED PREPARATION ACRE 2.47
42 2574.507 COMMON TOPSOIL BORROW C Y 100
43 2574.508 FERTILIZER TYPE 2 LB 494
44 2575.504 ROLLED EROSION PREVENTION CATEGORY 25 S Y 1,980
45 2575.505 SEEDING ACRE 2.47
46 2575.508 SEED MIXTURE 25-121 LB 299
47 2575.508 HYDRAULIC BONDED FIBER MATRIX LB 8,645
48 2575.523 RAPID STABILIZATION METHOD 3 MGAL 5
49 2580.503 INTERIM PAVEMENT MARKING L F 55,702
50 2582.503 4" SOLID LINE PAINT (WR) L F 11,880
51 2582.503 4" BROKEN LINE PAINT (WR) L F 6,021
52 2582.503 4" DOUBLE SOLID LINE PAINT (WR) L F 6,133
53 2582.503 6" SOLID LINE PAINT GROUND IN (WR) L F 72,797
54 2582.503 24" SOLID LINE PAINT GROUND IN (WR) L F 340
55 2582.503 6" DOTTED LINE PAINT GROUND IN (WR) L F 323
56 2582.518 PAVEMENT MESSAGE PAINT GROUND IN (WR) S F 58