Line Item Number Description Units Quantity
1 2021.501 MOBILIZATION LUMP SUM 1
2 2104.504 REMOVE BITUMINOUS PAVEMENT SQ YD 1,066
3 2106.507 EXCAVATION - COMMON (P) CU YD 82
4 2106.507 COMMON EMBANKMENT (CV) (P) CU YD 63
5 2118.507 AGGREGATE SURFACING (LV), CLASS SPECIAL (P) CU YD 40
6 2231.501 BITUMINOUS PATCHING MIXTURE TON 20
7 2232.501 MILL BITUMINOUS SURFACE (1.0") SQ YD 1,415
8 2232.501 MILL BITUMINOUS SURFACE (2.0") SQ YD 894
9 2357.606 BITUMINOUS MATERIAL FOR SHOULDER TACK GAL 83
10 2360.509 TYPE SP 12.5 WEARING COURSE MIXTURE (2,B) TON 450
11 2506.502 ADJUST FRAME AND RING CASTING EACH 1
12 2563.601 TRAFFIC CONTROL LUMP SUM 1
13 2575.501/0001 TURF ESTABLISHMENT LUMP SUM 1
14 2011.601 CONSTRUCTION SURVEYING LUMP SUM 1