Project Items

Line Item Number Description Units Quantity
1 2021.501 MOBILIZATION LUMP SUM 1
2 2104.503 SAWING BITUMINOUS PAVEMENT(FULL DEPTH) LIN FT 598
3 2104.503 REMOVE PIPE CULVERTS LIN FT 816
4 2104.504 REMOVE BITUMINOUS PAVEMENT SQ YD 4,191
5 2106.507 COMMON EMBANKMENT (CV) (P) CU YD 4,554
6 2211.507 AGGREGATE BASE (CV) CLASS 5 MOD (P) CU YD 1,604
7 2221.507 SHOULDER BASE AGGREGATE (LV) CLASS 1 (P) CU YD 137
8 2221.507 SHOULDER BASE AGGREGATE (LV) CLASS 1 CU YD 608
9 2232.504 MILL BITUMINOUS SURFACE (1.0") SQ YD 231
10 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) TON 2,625
11 2451.507 GRANULAR BACKFILL (CV) (P) CU YD 2,343
12 2451.507 GRANULAR BEDDING (CV) (P) CU YD 212
13 2501.502 24" RC PIPE APRON CLASS II EACH 18
14 2501.502 51" SPAN RC PIPE-ARCH APRON CLASS II EACH 2
15 2501.502 65" SPAN RC PIPE-ARCH APRON CLASS II EACH 2
16 2501.502 73" SPAN RC PIPE-ARCH APRON CLASS II EACH 2
17 2501.503 24" RC PIPE CULVERT CLASS II LIN FT 554
18 2501.503 51" SPAN RC PIPE-ARCH CULVERT CLASS II LIN FT 60
19 2501.503 65" SPAN RC PIPE-ARCH CLASS II LIN FT 52
20 2501.503 73" SPAN RC PIPE-ARCH CLASS II LIN FT 80
21 2501.507 CULVERT EXCAVATION CLASS U (P) CU YD 7,743
22 2563.601 TRAFFIC CONTROL LUMP SUM 1
23 2573.501 EROSION CONTROL SUPERVISOR LUMP SUM 1
24 2573.502 CULVERT END CONTROLS EACH 13
25 2575.501 TURF ESTABLISHMENT LUMP SUM 1
26 2575.504 ROLLED EROSION PREVENTION CATEGORY 25 SQ YD 3,238
27 2582.503 6" SOLID LINE PAINT LIN FT 20,483
28 2582.503 6" BROKEN LINE PAINT LIN FT 1,245
29 2582.503 24" SOLID LINE PAINT LIN FT 12