Line Item Number Description Units Quantity
1
17 2357.506 BITUMINOUS MATERIAL FOR TACK COAT GAL 492
2
30 2021.501 MOBILIZATION LS 1
31 2104.502 REMOVE CATCH BASIN (STORM) EACH 3
32 2104.501 REMOVE SEWER PIPE (STORM 24") LF 562
33 2501.502 30" RC PIPE APRON EACH 1
34 2501.502 42" RC PIPE APRON EACH 1
35 2503.603 15" HDPE PIPE APRON LF 1
36 2502.503 15" PERF PE PIPE DRAIN (SMOOTH) L F 248
38 2502.503 24" PERF HDPE PIPE DRAIN (SMOOTH) L F 468
39 2502.503 30" PERF HDPE PIPE DRAIN (SMOOTH) L F 149
40 2502.503 12" HDPE PIPE DRAIN (SMOOTH) L F 108
41 2502.503 15" HDPE PIPE DRAIN (SMOOTH) L F 163
42 2503.503 30" CLASS II RCP PIPE SEWER (STORM) LF 37
43 2501.511 42" CLASS II RCP PIPE SEWER (STORM) LF 40
44 2503.602 CONNECT TO EXISTING STORM SEWER EA 1
45 2503.602 CONNECT TO EXISTING MANHOLES EA 1
46 2506.502 CASTING ASSEMBLY (NEENAH R-3067-VB) EA 2
47 2506.502 CASTING ASSEMBLY (NEENAH R-3067-V) EA 14
48 2506.502 CASTING ASSEMBLY (NEENAH R-3295-2-C) EA 7
49 2506.502 CASTING ASSEMBLY (NEENAH R-4342) EA 2
50 2506.503 CONSTRUCT DRAINAGE STRUCTURE MnDOT 4020-48 LF 50
51 2506.503 CONSTRUCT DRAINAGE STRUCTURE MnDOT 4020-60 L F 36.2
52 2506.503 CONSTRUCT DRAINAGE STRUCTURE MnDOT 4020-72 L F 38.5
53 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1 LF 14.1
54 2506.503 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 2 LF 25.2
55 2511.507 RANDOM RIPRAP CLASS III TON 37
Uncategorized
1 2021.501 MOBILIZATION LS 1
2 2101.501 CLEARING ACRE 0.65
3 2101.505 GRUBBING ACRE 0.65
4 2101.502 CLEARING TREE 3
5 2101.507 GRUBBING TREE 3
6 2104.503 REMOVE METAL CULVERT L F 44
7 2104.503 REMOVE CURB & GUTTER L F 322
8 2104.504 Salvage Aggregate Base SY 5,471
9 2104.504 REMOVE BITUMINOUS PAVEMENT S Y 880
10 2104.518 REMOVE CONCRETE SIDEWALK S F 3,602
11 2106.507 EXCAVATION - COMMON (EV) (P) C Y 5,368
12 2106.507 COMMON EMBANKMENT (CV) (P) C Y 2,495
13 2123.510 1.0 CU YD SHOVEL HOUR 10
14 2211.501 AGGREGATE BASE CLASS 5 TON 4,460
15 2301.504 CONCRETE PAVEMENT 6" HIGH-EARLY S F 1,065
16 2301.508 SUPPLEMENTAL PAVEMENT REINFORCEMENT LB 1,350
17 2360.509 TYPE SP 9.5 WEARING COURSE MIX (2,B) TON 1,220
18 2360.502 TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,B) TON 3,640
19 2506.502 ADJUST FRAME & RING CASTING EACH 6
20 2511.509 RANDOM RIPRAP CLASS III TON 24
21 2521.618 6" CONCRETE WALK (ADA) SF 2,112
22 2521.618 4" CONCRETE WALK (ADA) SF 93
23 2531.503 CONCRETE CURB & GUTTER DESIGN B624 (ADA) L F 5,146
24 2531.503 CONCRETE CURB & GUTTER DESIGN B624 (ADA) HIGH EARLY L F 244
26 2563.601 TRAFFIC CONTROL LS 1
27 2573.501 EROSION CONTROL SUPERVISOR LS 1
28 2573.650 EROSION CONTROL LS 1
36 2502.503 12" PERF HDPE PIPE DRAIN (SMOOTH) L F 328
37 2502.503 18" PERF HDPE PIPE DRAIN (SMOOTH) L F 129