bidVAULT

Welcome, Guest!
Log in | Project Owner Login | Privacy Policy | Disclaimer | Official bid entry time: 07/27/2024 3:50 AM CDT | rss feed icon | calendar icon
 

Project Items

Line Item Number Description Units Quantity
CP 71-665-019 2024-CR 65 Reconstruction Reconstruction - CP 71-665-019
1 2021.501 MOBILIZATION LS 1
2 2051.501 MAINT AND RESTORATION OF HAUL ROADS LS 1
3 2101.501 CLEARING & GRUBBING LS 1
4 2104.502 SALVAGE CULVERT MARKER EACH 10
5 2104.502 SALVAGE MAIL BOX SUPPORT EACH 20
6 2104.502 SALVAGE FIRE NUMBER EACH 20
7 2104.503 SAWING CONCRETE PAVEMENT (FULL DEPTH) L F 25
8 2104.503 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) L F 159
9 2104.503 REMOVE FENCE L F 4,086
10 2104.503 REMOVE PIPE CULVERTS L F 258
11 2104.504 REMOVE BITUMINOUS PAVEMENT S Y 30,431
12 2104.518 REMOVE CONCRETE DRIVEWAY PAVEMENT S F 1,145
13 2104.518 REMOVE BITUMINOUS DRIVEWAY PAVEMENT S F 6,544
14 2106.507 EXCAVATION - COMMON (P) C Y 27,009
15 2106.507 EXCAVATION - SUBGRADE (P) CY 1,089
16 2106.507 COMMON EMBANKMENT (CV) C Y 12,204
17 2106.507 SELECT GRANULAR EMBANKMENT (CV) C Y 18,907
18 2112.519 SUBGRADE PREPARATION RDST 120
19 2123.510 DOZER HOUR 40
20 2130.523 WATER MGAL 250
21 2211.509 AGGREGATE BASE CLASS 5 TON 20,282
22 2221.609 SHOULDER BASE AGGREGATE SPECIAL TON 1,480
23 2232.604 MILL BITUMINOUS PAVEMENT (SPECIAL) S Y 70
24 2360.509 TYPE SP 9.5 WEARING COURSE MIXTURE (2,C) TON 5,380
25 2360.509 TYPE SP 12.5 WEARING COURSE MIXTURE (2,C) TON 5,060
26 2451.507 COARSE AGGREGATE BEDDING (CV) C Y 146
27 2501.502 15" CS SAFETY APRON AND GRATE DESIGN 3128 EACH 4
28 2501.502 15" CS PIPE APRON EACH 4
29 2501.502 18" CS PIPE APRON EACH 4
30 2501.502 INSTALL CULVERT MARKER EACH 10
31 2501.503 15" CP PIPE CULVERT L F 185
32 2501.503 18" CP PIPE CULVERT L F 180
33 2531.504 6" CONCRETE DRIVEWAY PAVEMENT S Y 138
34 2540.602 INSTALL FIRE NUMBER EACH 20
35 2540.602/0001 INSTALL TEMPORARY MAIL BOX SUPPORT EACH 20
36 2540.602 INSTALL MAIL BOX SUPPORT EACH 20
37 2563.601 TRAFFIC CONTROL LS 1
38 2563.601 DETOUR SIGNING LS 1
39 2564.602 INSTALL STEEL POST EACH 20
40 2573.502 CULVERT END CONTROLS EACH 14
41 2573.503 SILT FENCE, TYPE MS L F 3,770
42 2573.601/0001 STORM WATER MANAGEMENT LS 1
43 2573.610 SEDIMENT REMOVAL HOUR 25
44 2574.505 SOIL BED PREPARATION ACRE 19.3
45 2574.507 COMMON TOPSOIL BORROW C Y 200
46 2574.508 FERTILIZER TYPE 1 LB 3,850
47 2575.505 SEEDING ACRE 19
48 2575.508 SEED MIXTURE 21-111 LB 1,926
49 2575.508 SEED MIXTURE 25-121 LB 1,174
50 2575.508 HYDRAULIC MULCH MATRIX LB 38,500
51 2575.508 HYDRAULIC BONDED FIBER MATRIX LB 67,375
52 2582.503 4" SOLID LINE MULTI COMP GR IN L F 1,416
53 2582.503 6" SOLID LINE MULTI COMP GR IN L F 25,992
54 2582.503 4" BROKEN LINE MULTI COMP GR IN L F 2,222
55 2582.503 8" DOTTED LINE MULTI COMP GR IN L F 160
56 2582.503 4" DOUBLE SOLID LINE MULTI-COMPONENT GROUND IN L F 1,888
TWP 20-2024-01 74th Street Surface Improvement Mill & Overlay - TWP 20-2024-2021
1 2021.501 MOBILIZATION LS 1
2 2104.502 REMOVE MAIL BOX SUPPORT EACH 20
3 2104.502 SALVAGE MAILBOX EA 20
4 2104.503 SAWING CONCRETE PAVEMENT (FULL DEPTH) L F 320
5 2104.503 SAWING BITUMINOUS PAVEMENT L F 210
6 2104.504 REMOVE CONCRETE DRIVEWAY PAVEMENT S Y 100
7 2104.504 REMOVE BITUMINOUS DRIVEWAY PAVEMENT S Y 70
8 2215.504 FULL DEPTH BIT PAVEMENT RECLAMATION S Y 8,230
9 2221.609 SHOULDER BASE AGGREGATE, CLASS 5 (B) TON 250
10 2232.504 MILL BITUMINOUS JOINT (1.0") L F 46
11 2360.509 TYPE SP 12.5 WEARING COURSE MIXTURE (2,B) TON 950
12 2531.504 6" CONCRETE DRIVEWAY PAVEMENT S Y 100
13 2540.602 FURNISH & INSTALL MAIL BOX SUPPORT EACH 20
14 2540.603 PROVIDE TEMP COMMUNITY MAILBOX ASS'Y LS 1
15 2563.601 TRAFFIC CONTROL LS 1