Project Items

Line Item Number Description Units Quantity
2021.501/00010 MOBILIZATION LUMP SUM 1
2123.610/00045 STREET SWEEPER (WITH PICKUP BROOM) HOUR 9
2355.502/00010 BITUMINOUS MATERIAL FOR FOG SEAL GALLON 17,171
2356.505/00010 BITUMINOUS MATERIAL FOR SEAL COAT GALLON 97,302
2356.506/000200 BITUMINOUS SEAL COAT (FA 2) SQ YD 49,519
2356.506/000250 BITUMINOUS SEAL COAT (FA 2 1/2) SQ YD 254,434
2563.601/00010 TRAFFIC CONTROL LUMP SUM 1
2580.603/00010 INTERIM PAVEMENT MARKING LIN FT 76,401
2582.501/10000 PAVT MSSG PAINT SQ FT 1,484
2582.502/10104 4" SOLID LINE PAINT LIN FT 136,089
2582.502/10112 12" SOLID LINE PAINT LIN FT 286
2582.502/10124 24" SOLID LINE PAINT LIN FT 60
2582.502/10204 4" BROKEN LINE PAINT LIN FT 7,180
2582.502/10308 8" DOTTED LINE PAINT LIN FT 50
2582.502/10404 4" DBLE SOLID LINE PAINT LIN FT 27,123