Line | Item Number | Description | Units | Quantity |
---|---|---|---|---|
SAP 159-201-006 - 1 TRAFFIC (650) | ||||
2021.501/00010 | MOBILIZATION | LS | 1 | |
2506.502/06020 | ADJUST FRAME & RING CASTING | EACH | 2 | |
2563.601/00010 | TRAFFIC CONTROL | LS | 1 | |
2565.501/00040 | EMERGENCY VEHICLE PREEMPTION SYSTEM | LS | 1 | |
2565.501/00110 | TRAFFIC CONTROL INTERCONNECT | LS | 1 | |
2565.516/00010 | TRAFFIC CONTROL SIGNAL SYSTEM | SYS | 1 | |
2573.502/00110 | STORM DRAIN INLET PROTECTION | EACH | 7 | |
2575.602/00700 | SITE RESTORATION | EACH | 4 | |
2582.503/10124 | 24" SOLID LINE PAINT | L F | 114 | |
2582.518/05000 | CROSSWALK PAINT | S F | 378 | |
SAP 159-201-006 - 2 PED FACILITIES (550) | ||||
2104.518/00100 | REMOVE BITUMINOUS WALK | S F | 225 | |
2104.518/00130 | REMOVE CONCRETE SIDEWALK | S F | 584 | |
2521.518/00060 | 6" CONCRETE WALK | S F | 1,103 | |
2531.618/00010 | TRUNCATED DOMES | S F | 76 | |
SAP 159-201-006 - 3 STREET (350) | ||||
2104.503/00315 | REMOVE CURB & GUTTER | L F | 162 | |
2104.603/01810 | REMOVE & REPLACE BITUMINOUS PAVEMENT | L F | 162 | |
2531.503/02320 | CONCRETE CURB & GUTTER DESIGN B624 | L F | 162 | |
2531.503/23706 | CONCRETE CURB DESIGN V6 | L F | 40 |