Project Items
Line | Item Number | Description | Units | Quantity |
---|---|---|---|---|
CP 19-060-02 CL Tiling | ||||
2021.501/00010 | MOBILIZATION | LS | 1 | |
2502.502/00040 | 4" PRECAST CONCRETE HEADWALL | EACH | 12 | |
2502.503/10040 | 4" PERF PE PIPE DRAIN | L F | 18,660 | |
2563.601/00010 | TRAFFIC CONTROL | LS | 1 | |
CP 19-063-04 Reclaim/CL Tiling | ||||
2215.501 | FULL DEPTH RECLAMATION | SY | 14,453 | |
2502.502/00040 | 4" PRECAST CONCRETE HEADWALL | EACH | 7 | |
2502.503/10040 | 4" PERF PE PIPE DRAIN | L F | 5,420 | |
CP 19-079-05 CL Tiling | ||||
2502.502/00040 | 4" PRECAST CONCRETE HEADWALL | EACH | 18 | |
2502.503/10040 | 4" PERF PE PIPE DRAIN | L F | 12,905 | |
CP 19-093-01 CL Tiling | ||||
2502.502/00040 | 4" PRECAST CONCRETE HEADWALL | EACH | 6 | |
2502.503/10040 | 4" PERF PE PIPE DRAIN | L F | 20,675 |