bidVAULT

Welcome, Guest!
Log in | Project Owner Login | Privacy Policy | Disclaimer | Official bid entry time: 03/28/2024 4:40 AM CDT | rss feed icon | calendar icon
 

Project Items

Line Item Number Description Units Quantity
2016.601/00050 QUALITY MANAGEMENT LS 1
2016.601/00051 QUALITY MANAGEMENT SPECIAL LS 1
2021.501/00010 MOBILIZATION LS 1
2112.604/00010 SUBGRADE PREPARATION S Y 1,500
2123.510/00020 MOTOR GRADER HOUR 50
2123.510/00130 DOZER HOUR 50
2130.523/00010 WATER MGAL 125
2211.509/00080 AGGREGATE BASE CLASS 5 MOD TON 57,565
2211.604/00020 AGGREGATE BASE SPECIAL S Y 153,825
2221.509/00010 SHOULDER BASE AGGREGATE CLASS 1 TON 19,500
2357.506/00010 BITUMINOUS MATERIAL FOR TACK COAT GAL 14,350
2360.509/22205 TYPE SP 12.5 NON WEAR COURSE MIX (2;B) TON 26,950
2360.509/22300 TYPE SP 12.5 WEARING COURSE MIX (2;C) TON 25,760
2563.601/00010 TRAFFIC CONTROL LS 1
2573.501/00030 EROSION CONTROL SUPERVISOR LS 1
2573.502/00140 CULVERT END CONTROLS EACH 83
2573.503/00023 SILT FENCE; TYPE MS L F 920
2573.503/00061 SEDIMENT CONTROL LOG TYPE WOOD FIBER L F 360
2574.507/00100 COMMON TOPSOIL BORROW C Y 1,500
2574.508/00011 FERTILIZER TYPE 1 LB 16,000
2575.504/00110 RAPID STABILIZATION METHOD 4 S Y 22,178
2575.505/00021 SEEDING ACRE 80
2575.505/00025 DISK ANCHORING ACRE 80
2575.505/00055 RAPID STABILIZATION METHOD 1 ACRE 28.26
2575.508/25141 SEED MIXTURE 25-141 LB 4,720
2575.509/00030 MULCH MATERIAL TYPE 3 TON 160
2575.523/00020 RAPID STABILIZATION METHOD 3 MGAL 18
2582.503/10104 4" SOLID LINE PAINT L F 3,000
2582.503/10106 6" SOLID LINE PAINT L F 93,100
2582.503/10204 4" BROKEN LINE PAINT L F 9,025