Line | Item Number | Description | Units | Quantity |
---|---|---|---|---|
2021.501/00010 | MOBILIZATION | LUMP SUM | 1 | |
2104.504/00120 | REMOVE BITUMINOUS PAVEMENT | SQ YD | 250 | |
2104.505/00110 | REMOVE CONCRETE PAVEMENT | SQ YD | 64 | |
2112.519/00010 | SUBGRADE PREPARATION | ROAD STA | 11 | |
2112.619/00030 | SHOULDER PREPARATION | ROAD STA | 8 | |
2118.509/00010 | AGGREGATE SURFACING CLASS 1 | TON | 123 | |
2211.509/00070 | AGGREGATE BASE CLASS 5 | TON | 242 | |
2232.504/00060 | MILL BITUMINOUS SURFACE (2.0") | SQ YD | 3,968 | |
2357.506/00010 | BITUMINOUS MATERIAL FOR TACK COAT | GALLON | 718 | |
2357.606/00020 | BITUMINOUS MATERIAL FOR SHOULDER TACK | GALLON | 115 | |
2360.509/12200 | TYPE SP 9.5 WEARING COURSE MIX (2,B) | TON | 994 | |
2406.604/00010 | CONCRETE APPROACH PANELS | SQ YD | 64 | |
2433.618/00225 | RECONSTRUCT CONCRETE END WALL | SQ FT | 60 | |
2503.503/20030 | INSTALL PIPE SEWER | LIN FT | 120 | |
2503.602/00365 | CONNECT INTO EXISTING CONCRETE STRUCTURE | EACH | 1 | |
2511.507/00013 | RANDOM RIPRAP CLASS II | CU YD | 2 | |
2563.601/00010 | TRAFFIC CONTROL | LUMP SUM | 1 | |
2573.503/00064 | SEDIMENT CONTROL LOG TYPE COMPOST | LIN FT | 75 | |
2574.507/00100 | COMMON TOPSOIL BORROW | CU YD | 103 | |
2575.604/00700 | SITE RESTORATION | SQ YD | 678 | |
2582.503/10104 | 4" SOLID LINE PAINT | LIN FT | 576 | |
2582.503/10124 | 24" SOLID LINE PAINT | LIN FT | 26 | |
2582.503/30104 | 4" SOLID LINE MULTI COMP | LIN FT | 1,832 | |
2582.503/30404 | 4" DBLE SOLID LINE MULTI COMP | LIN FT | 766 | |
2582.518/01000 | PAVT MSSG PAINT | SQ FT | 4 |