Project Items

Line Item Number Description Units Quantity
2021.501/00010 MOBILIZATION LUMP SUM 1
2123.610/00410 STREET SWEEPER (WITH PICKUP BROOM) HOUR 7
2355.506/00010 BITUMINOUS MATERIAL FOR FOG SEAL GALLON 53,569
2356.504/00025 BITUMINOUS SEAL COAT (FA 2 1/2) SQ YD 740,647
2356.506/00020 BITUMINOUS MATERIAL FOR SEAL COAT GALLON 240,733
2563.601/00010 TRAFFIC CONTROL LUMP SUM 1
2580.503/00010 INTERIM PAVEMENT MARKING LIN FT 247,060
2582.503/10104 4" SOLID LINE PAINT LIN FT 447,660
2582.503/10124 24" SOLID LINE PAINT LIN FT 146.5
2582.503/10204 4" BROKEN LINE PAINT LIN FT 22,910
2582.503/10308 8" DOTTED LINE PAINT LIN FT 160
2582.503/10404 4" DBLE SOLID LINE PAINT LIN FT 93,839
2582.518/01000 PAVT MSSG PAINT SQ FT 75