Project Items
Line | Item Number | Description | Units | Quantity |
---|---|---|---|---|
BR 68J52 | ||||
2123.510/003 | 3.0 CU YD SHOVEL | HOUR | 5 | |
2412.502/009 | 12' X 6' PRECAST CONCRETE BOX CULVERT END SECT | EACH | 2 | |
2412.503/1010 | 12' X 6' PRECAST CONCRETE BOX CULVERT CLASS II | LIN FT | 40 | |
2451.501/00107 | STRUCTURE EXCAVATION CLASS U | CU YD | 780 | |
2451.507/00030 | GRANULAR BEDDING (CV) | CU YD | 130 | |
2511.507/001 | RANDOM RIPRAP CLASS III | CU YD | 60 | |
2563.601/00010 | TRAFFIC CONTROL | LUMP SUM | 1 | |
NON PARTICAPATING | ||||
2104.503 | REMOVE CULVERT PIPE | LIN FT | 36 | |
2105.507/002 | COMMON BORROW (LV) | CU YD | 240 | |
2123.510/003 | 3.0 CU YD SHOVEL | HOUR | 5 | |
2211.507/002 | AGGREGATE BASE (LV) CLASS 5 MODIFIED | CU YD | 34 | |
2573.503/0011 | FLOTATION SILT CURTAIN TYPE MOVING WATER | LIN FT | 50 | |
2575.501/002 | TURF ESTABLISHMENT | LUMP SUM | 1 | |
2575.504/1111 | EROSION CONTROL BLANKET, CATEGORY 1 | SQ YD | 46 | |
SD 91 LAT 4 | ||||
2104.607/00022 | SALVAGE RANDOM RIPRAP | CU YD | 67 | |
2105.507/002 | COMMON BORROW (LV) | CU YD | 680 | |
2105.603/00060 | DITCH CLEANING | LIN FT | 350 | |
2511.507/001 | RANDOM RIPRAP CLASS III | CU YD | 130 | |
2511.607/00120 | INSTALL RANDOM RIPRAP | CU YD | 67 |