J2594-2020 - 1 GENERAL ENGINEERING (091) |
|
0100.000/00000 |
MOBILIZATION |
LS |
1 |
|
0200.000/00000 |
TEMPORARY DUST ENCLOSURES, BARRICADES & TRAFFIC CONTROL |
LS |
1 |
|
0300.000/00000 |
TOP OF SLAB REPAIR |
SF |
2,600 |
|
0400.000/00000 |
TOP OF HELIX SLAB REPAIR |
SF |
650 |
|
0500.000/00000 |
BOTTOM OF SLAB REPAIR |
SF |
18 |
|
0600.000/00000 |
BOTTOM OF HELIX SLAB REPAIR |
SF |
50 |
|
0700.000/00000 |
INSTALL MEMBRANE AT SLAB REPAIRS AREAS |
SF |
2,615 |
|
0800.000/00000 |
PAINT BOTTOM SIDE OF PARKING SLABS AT CONCRETE REPAIR LOCATIONS |
SF |
18 |
|
0900.000/00000 |
APPLY PROTECTIVE COATING AT BOTTOM SIDE OF HELIX SLABS AT CONCRETE REPAIR LOCATIONS |
SF |
50 |
Alternate 1 |
J2594-2020 - 2 GENERAL ENGINEERING (091) |
|
9000.000/00000 |
SOUTHWEST STAIRWAY RESTORATION |
LS |
1 |