bidVAULT

Welcome, Guest!
Log in | Project Owner Login | Privacy Policy | Disclaimer | Official bid entry time: 03/18/2024 10:22 PM CDT | rss feed icon | calendar icon
 

Project Items

Line Item Number Description Units Quantity
2021.501/00010 MOBILIZATION LUMP SUM 1
2041.610/02000 TRAINEES HOURS 1,800
2550.502/00160 FIBEROPTIC SPLICE VAULT EACH 149
2550.502/00170 OUTDOOR FIBER SPLICE ENCLOSURE EACH 70
2550.503/00103 4" RIGID STEEL CONDUIT LIN FT 325
2550.503/10112 SIGNAL CONTROL CABLE 1 COND NO 12 LIN FT 162,710
2550.602/03563 FIBER OPTIC TERMINATION PANEL EACH 74
2550.602/03594 FIBER OPTIC PIGTAIL TERMINATION EACH 76
2550.602/03596 FIBER OPTIC CABLE SPLICING EACH 4,740
2550.602/03620 CORE DRILLED HOLE EACH 512
2550.603/66048 FIBER OPTIC TRUNK CABLE 48SM LIN FT 11,943
2550.603/66144 FIBER OPTIC TRUNK CABLE 144SM LIN FT 169,857
2550.603/68038 1.25" BORED CONDUIT LIN FT 319,362
2550.603/68103 4" BORED CONDUIT LIN FT 2,570
2563.601/00010 TRAFFIC CONTROL LUMP SUM 1
2575.601/00700 SITE RESTORATION LUMP SUM 1