Line | Item Number | Description | Units | Quantity |
---|---|---|---|---|
2021.501/00010 | MOBILIZATION | LUMP SUM | 1 | |
2041.610/02000 | TRAINEES | HOURS | 1,800 | |
2550.502/00160 | FIBEROPTIC SPLICE VAULT | EACH | 149 | |
2550.502/00170 | OUTDOOR FIBER SPLICE ENCLOSURE | EACH | 70 | |
2550.503/00103 | 4" RIGID STEEL CONDUIT | LIN FT | 325 | |
2550.503/10112 | SIGNAL CONTROL CABLE 1 COND NO 12 | LIN FT | 162,710 | |
2550.602/03563 | FIBER OPTIC TERMINATION PANEL | EACH | 74 | |
2550.602/03594 | FIBER OPTIC PIGTAIL TERMINATION | EACH | 76 | |
2550.602/03596 | FIBER OPTIC CABLE SPLICING | EACH | 4,740 | |
2550.602/03620 | CORE DRILLED HOLE | EACH | 512 | |
2550.603/66048 | FIBER OPTIC TRUNK CABLE 48SM | LIN FT | 11,943 | |
2550.603/66144 | FIBER OPTIC TRUNK CABLE 144SM | LIN FT | 169,857 | |
2550.603/68038 | 1.25" BORED CONDUIT | LIN FT | 319,362 | |
2550.603/68103 | 4" BORED CONDUIT | LIN FT | 2,570 | |
2563.601/00010 | TRAFFIC CONTROL | LUMP SUM | 1 | |
2575.601/00700 | SITE RESTORATION | LUMP SUM | 1 |