Line |
Item Number |
Description |
Units |
Quantity |
|
2016.601/00055 |
QUALITY MANAGEMENT - E-TICKETING |
LUMP SUM |
1 |
|
2021.501/00010 |
MOBILIZATION |
LUMP SUM |
1 |
|
2104.502/00130 |
REMOVE PIPE APRON |
EACH |
6 |
|
2104.503/00255 |
REMOVE PIPE CULVERTS |
LIN FT |
6 |
|
2104.503/01370 |
SALVAGE PIPE CULVERT |
LIN FT |
6 |
|
2106.507/00010 |
EXCAVATION - COMMON |
CU YD |
66 |
|
2106.507/00080 |
SELECT GRANULAR EMBANKMENT (CV) |
CU YD |
10 |
|
2112.519/00010 |
SUBGRADE PREPARATION |
ROAD STA |
170 |
|
2118.609/00080 |
AGGREGATE SURFACING SPECIAL |
TON |
1,742 |
|
2215.504/00010 |
FULL DEPTH RECLAMATION |
SQ YD |
49,660 |
|
2232.504/00020 |
MILL BITUMINOUS SURFACE (1.0") |
SQ YD |
47,189 |
|
2357.506/00010 |
BITUMINOUS MATERIAL FOR TACK COAT |
GALLON |
2,643 |
|
2357.606/00020 |
BITUMINOUS MATERIAL FOR SHOULDER TACK |
GALLON |
1,359 |
|
2360.509/22120 |
TYPE SP 9.5 WEARING COURSE MIX (2,B) SPEC |
TON |
5,161 |
|
2360.509/22220 |
TYPE SP 12.5 WEARING COURSE MIX (2,B) SPEC |
TON |
6,456 |
|
2451.507/00270 |
COARSE AGGREGATE BEDDING (CV) |
CU YD |
8 |
|
2501.502/01018 |
18" CS PIPE APRON |
EACH |
6 |
|
2501.502/05024 |
24" RC PIPE APRON |
EACH |
1 |
|
2501.503/25010 |
INSTALL PIPE CULVERT |
LIN FT |
6 |
|
2501.603/25080 |
CLEAN PIPE CULVERT |
LIN FT |
211 |
|
2507.603/10018 |
LINING CULVERT PIPE (18") SPECIAL |
LIN FT |
196 |
|
2511.504/00014 |
GEOTEXTILE FILTER TYPE 4 |
SQ YD |
34 |
|
2511.507/00014 |
RANDOM RIPRAP CLASS III |
CU YD |
10 |
|
2540.602/00150 |
MAIL BOX SUPPORT |
EACH |
24 |
|
2563.601/00010 |
TRAFFIC CONTROL |
LUMP SUM |
1 |
|
2575.604/00700 |
SITE RESTORATION |
SQ YD |
175 |
|
2580.503/00010 |
INTERIM PAVEMENT MARKING |
LIN FT |
53,924 |
|
2582.503/10104 |
4" SOLID LINE PAINT |
LIN FT |
38,158 |
|
2582.503/10204 |
4" BROKEN LINE PAINT |
LIN FT |
1,740 |
|
2582.503/10404 |
4" DBLE SOLID LINE PAINT |
LIN FT |
8,258 |