Line |
Item Number |
Description |
Units |
Quantity |
S.A.P. 011-614-002 |
|
2021.501 |
MOBILIZATION |
LS |
1 |
|
2051.501 |
MAINT & RESTORATION OF HAUL ROAD |
LS |
1 |
|
2104.503 |
REMOVE CURB & GUTTER |
LF |
1,172 |
|
2104.503 |
SAWING BIT PAVEMENT (FULL DEPTH) |
LF |
120 |
|
2104.504 |
REMOVE BITUMINOUS PAVEMENT |
SY |
10 |
|
2104.504 |
REMOVE CONCRETE WALK |
SY |
1,331 |
|
2104.618 |
REMOVE AND REPLACE BITUMINOUS PAVEMENT |
SF |
2,450 |
|
2123.510 |
2.0 CU YD SHOVEL |
HOUR |
5 |
|
2123.510 |
DOZER |
HOUR |
5 |
|
2123.510 |
MOTOR GRADER |
HOUR |
5 |
|
2211.509 |
AGGREGATE BASE CLASS 5 |
TON |
139 |
|
2232.504 |
MILL BITUMINOUS SURFACE (1.5") |
SY |
12,793 |
|
2301.602 |
DRILL & GROUT REINFORCEMENT BAR (EPOXY COATED) |
EACH |
112 |
|
2360.509 |
TYPE SP 9.5 WEARING COURSE MIX (2,B) |
TON |
1,518 |
|
2504.602 |
ADJUST GATE VALVE |
EACH |
8 |
|
2506.502 |
ADJUST FRAME & RING CASTING |
EACH |
13 |
|
2521.518 |
4" CONCRETE WALK |
SF |
10,533 |
|
2521.618 |
CONCRETE WALK |
SF |
1,449 |
|
2531.504 |
6" CONCRETE DRIVEWAY PAVEMENT |
SY |
156 |
|
2531.603 |
CONCRETE CURB AND GUTTER |
LF |
1,172 |
|
2531.618 |
TRUNCATED DOMES |
SF |
206 |
|
2563.601 |
TRAFFIC CONTROL |
LS |
1 |
|
2573.502 |
STORM DRAIN INLET PROTECTION |
EACH |
22 |
|
2575.618 |
SITE RESTORATION |
SF |
13,221 |
|
2580.503 |
INTERIM PAVEMENT MARKING |
LF |
224 |
|
2582.503 |
4" BROKEN LINE PAINT |
LF |
404 |
|
2582.503 |
4" SOLID LINE PAINT |
LF |
10,371 |
|
2582.518 |
CROSSWALK PAINT |
SF |
780 |
S.A.P. 011-642-003 |
|
2016.601 |
QUALITY MANAGEMENT - E TICKETING |
LS |
1 |
|
2016.601 |
QUALITY MANAGEMENT - INTELLIGENT COMPACTION |
LS |
1 |
|
2016.601 |
QUALITY MANAGEMENT - THERMAL PROFILING |
LS |
1 |
|
2021.501 |
MOBILIZATION |
LS |
1 |
|
2051.501 |
MAINT & RESTORATION OF HAUL ROAD |
LS |
1 |
|
2104.502 |
REMOVE PIPE APRON |
EACH |
30 |
|
2104.503 |
REMOVE PIPE CULVERT |
LF |
327 |
|
2104.504 |
REMOVE BITUMINOUS PAVEMENT |
SY |
2,731 |
|
2105.504 |
GEOGRID |
SY |
3,263 |
|
2105.504 |
GEOTEXTILE FABRIC TYPE 5 |
SY |
8,676 |
|
2106.507 |
COMMON EMBANKMENT (CV) (P) |
CY |
5,432 |
|
2106.507 |
EXCAVATION - COMMON (P) |
CY |
4,782 |
|
2106.507 |
EXCAVATION - SUBGRADE (P) |
CY |
6,507 |
|
2106.507 |
SELECT GRANULAR EMBANKMENT (CV) (P) |
CY |
3,072 |
|
2118.609 |
AGGREGATE SURFACING SPECIAL |
TON |
2,588 |
|
2123.51 |
2.0 CU YD SHOVEL |
HOUR |
10 |
|
2123.51 |
DOZER |
HOUR |
10 |
|
2123.51 |
MOTOR GRADER |
HOUR |
5 |
|
2211.509 |
AGGREGATE BASE CLASS 5 |
TON |
5,855 |
|
2215.504 |
FULL DEPTH RECLAMATION |
SY |
83,825 |
|
2232.504 |
MILL BITUMINOUS SURFACE (1.5") |
SY |
65,696 |
|
2232.604 |
MILL BITUMINOUS PAVEMENT (SPECIAL) |
SY |
173 |
|
2357.606 |
BITUMINOUS MATERIALFOR SHOULDER TACK |
GAL |
1,733 |
|
2360.509 |
TYPE SP 9.5 WEARING COURSE MIX (2,B) SPEC |
TON |
19,256 |
|
2501.502 |
15" CAS PIPE APRON |
EACH |
14 |
|
2501.502 |
24" CAS PIPE APRON |
EACH |
32 |
|
2501.502 |
CULVERT MARKER |
EACH |
32 |
|
2501.503 |
15" CAS PIPE CULVERT |
LF |
274 |
|
2503.503 |
24" CAS PIPE SEWER 14 GAUGE |
LF |
112 |
|
2504.607 |
LIGHT WEIGHT FILL (CV) (P) |
CY |
4,989 |
|
2507.503 |
LINING CULVERT PIPE 24" |
LF |
1,178 |
|
2511.507 |
RANDOM RIPRAP CLASS II |
CY |
20 |
|
2540.602 |
MAIL BOX SUPPORT |
EACH |
43 |
|
2540.602 |
TEMPORARY MAIL BOX SUPPORT |
EACH |
8 |
|
2563.601 |
TRAFFIC CONTROL |
LS |
1 |
|
2573.502 |
CULVERT END CONTROLS |
EACH |
8 |
|
2573.503 |
SEDIMENT CONTROL LOG TYPE STRAW |
LF |
320 |
|
2573.503 |
SILT FENCE TYPE MS |
LF |
3,840 |
|
2574.505 |
SOIL BED PREPARATION (P) |
ACRE |
4 |
|
2574.508 |
FERTILIZER TYPE 3 |
LBS |
1,426 |
|
2575.504 |
ROLLED EROSION PREVENTION CATEGORY 25 |
SY |
3,784 |
|
2575.505 |
DISK ANCHORING |
ACRE |
1.5 |
|
2575.505 |
SEEDING (P) |
ACRE |
4 |
|
2575.508 |
HYDRAULIC BONDED FIBER MATRIX |
LBS |
5,600 |
|
2575.508 |
SEED MIXTURE 25-121 |
LBS |
297 |
|
2575.509 |
MULCH MATERIAL, TYPE 3 |
TON |
3.2 |
|
2575.523 |
RAPID STABILIZATION METHOD 3 |
M GAL |
9.6 |
|
2580.503 |
INTERIM PAVEMENT MARKING |
LF |
5,980 |
|
2582.503 |
4" BROKEN LINE PAINT |
LF |
3,260 |
|
2582.503 |
4" SOLID LINE PAINT |
LF |
80,939 |
S.A.P. 011-643-003 |
|
2016.601 |
QUALITY MANAGEMENT - E-TICKETING |
LS |
1 |
|
2021.501 |
MOBILIZATION |
LS |
1 |
|
2051.501 |
MAINT & RESTORATION OF HAUL ROAD |
LS |
1 |
|
2104.503 |
REMOVE CATTLE PASS |
LF |
70 |
|
2104.504 |
REMOVE BITUMINOUS PAVEMENT |
SY |
529 |
|
2106.507 |
COMMON EMBANKMENT (CV) (P) |
CY |
300 |
|
2106.507 |
EXCAVATION - COMMON (P) |
CY |
919 |
|
2106.507 |
SELECT GRANULAR EMBANKMENT (CV) (P) |
CY |
769 |
|
2118.609 |
AGGREGATE SURFACING SPECIAL |
TON |
2,740 |
|
2123.51 |
2.0 CU YD SHOVEL |
HOUR |
5 |
|
2123.51 |
DOZER |
HOUR |
5 |
|
2123.51 |
MOTOR GRADER |
HOUR |
5 |
|
2211.507 |
AGGREGATE BASE, CLASS 5 (P) |
CY |
257 |
|
2215.504 |
FULL DEPTH RECLAMATION |
SY |
41,931 |
|
2232.504 |
MILL BITUMINOUS SURFACE (1.0") |
SY |
40 |
|
2232.504 |
MILL BITUMINOUS SURFACE (2.0") |
SY |
32,644 |
|
2357.606 |
BITUMINOUS MATERIALFOR SHOULDER TACK |
GAL |
1,776 |
|
2360.509 |
TYPE SP 9.5 WEARING COURSE MIX (2,B)SPEC |
TON |
6,895 |
|
2501.502 |
24" CAS PIPE APRON |
EACH |
2 |
|
2501.502 |
INSTALL CULVERT MARKER |
EACH |
12 |
|
2503.503 |
24" CAS PIPE SEWER 14 GAUGE |
LF |
72 |
|
2540.602 |
MAIL BOX SUPPORT |
EACH |
12 |
|
2563.601 |
TRAFFIC CONTROL |
LS |
1 |
|
2573.502 |
CULVERT END CONTROLS |
EACH |
1 |
|
2573.503 |
SILT FENCE, TYPE PA |
LF |
300 |
|
2574.505 |
SOIL BED PREPARATION (P) |
ACRE |
0.2 |
|
2574.508 |
FERTILIZER TYPE 3 |
LBS |
30 |
|
2575.505 |
SEEDING (P) |
ACRE |
0.2 |
|
2575.508 |
HYDRAULIC BONDED FIBER MATRIX |
LBS |
700 |
|
2575.508 |
SEED MIXTURE 25-121 |
LBS |
12 |
|
2580.503 |
INTERIM PAVEMENT MARKING |
LF |
1,776 |
|
2582.503 |
4" BROKEN LINE PAINT |
LF |
1,300 |
|
2582.503 |
4" SOLID LINE PAINT |
LF |
36,334 |
S.A.P. 011-643-004 |
|
2021.501 |
MOBILIZATION |
LS |
1 |
|
2051.501 |
MAINT & RESTORATION OF HAUL ROAD |
LS |
1 |
|
2101.501 |
CLEARING & GRUBBING |
LS |
1 |
|
2104.503 |
REMOVE PIPE CULVERT |
LF |
498 |
|
2104.503 |
SAWING BITUMINOUS PAVEMENT |
LF |
14 |
|
2104.503 |
SAWING CONCRETE PAVEMENT |
LF |
20 |
|
2104.504 |
REMOVE BITUMINOUS DRIVEWAY PAVEMENT |
SY |
45 |
|
2104.504 |
REMOVE BITUMINOUS PAVEMENT |
SY |
312 |
|
2104.504 |
REMOVE CONCRETE DRIVEWAY PAVEMENT |
SY |
44 |
|
2106.507 |
COMMON EMBANKMENT (CV) (P) |
CY |
6,638 |
|
2106.507 |
EXCAVATION - COMMON (P) |
CY |
10,205 |
|
2106.507 |
SELECT GRANULAR EMBANKMENT MOD 10% (CV) (P) |
CY |
756 |
|
2118.609 |
AGGREGATE SURFACING SPECIAL |
TON |
1,371 |
|
2123.51 |
2.0 CU YD SHOVEL |
HOUR |
10 |
|
2123.51 |
DISK HARROW |
HOUR |
10 |
|
2123.51 |
DOZER |
HOUR |
10 |
|
2123.51 |
MOTOR GRADER |
HOUR |
10 |
|
2211.509 |
AGGREGATE BASE CLASS 5 MODIFIED |
TON |
20,580 |
|
2232.504 |
MILL BITUMINOUS SURFACE (1.5") |
SY |
3,843 |
|
2357.606 |
BITUMINOUS MATERIALFOR SHOULDER TACK |
GAL |
1,031 |
|
2360.509 |
TYPE SP 9.5 WEARING COURSE MIX (2,B) SPEC |
TON |
5,174 |
|
2501.502 |
15" CAS SAFETY APRON |
EACH |
24 |
|
2501.502 |
24" CAS PIPE APRON |
EACH |
6 |
|
2501.502 |
48" CAS PIPE APRON |
EACH |
4 |
|
2501.502 |
CULVERT MARKER |
EACH |
6 |
|
2501.503 |
15" CAS PIPE CULVERT |
LF |
502 |
|
2501.503 |
24" CAS PIPE CULVERT |
LF |
90 |
|
2503.503 |
24" CAS PIPE SEWER 14 GAUGE |
LF |
48 |
|
2503.503 |
48" CAS PIPE SEWER 14 GAUGE |
LF |
104 |
|
2511.507 |
RANDOM RIPRAP CLASS II |
CY |
74 |
|
2540.602 |
MAIL BOX SUPPORT |
EACH |
10 |
|
2540.602 |
TEMPORARY MAIL BOX SUPPORT |
EACH |
10 |
|
2563.601 |
TRAFFIC CONTROL |
LS |
1 |
|
2573.502 |
CULVERT END CONTROLS |
EACH |
15 |
|
2573.503 |
FLOATATION SILT CURTAIN TYPE MOVING WATER |
LF |
70 |
|
2573.503 |
SEDIMENT CONTROL LOG TYPE STRAW |
LF |
264 |
|
2573.503 |
SILT FENCE TYPE PA |
LF |
8,668 |
|
2573.602 |
SEDIMENT CONTROLSTRUCTURE, TYPE TOPSOIL |
EACH |
6 |
|
2574.505 |
SOIL BED PREPARATION (P) |
ACRE |
6.1 |
|
2574.508 |
FERTILIZER TYPE 3 |
LBS |
2,120 |
|
2575.504 |
ROLLED EROSION PREVENTION CATEGORY 25 |
SY |
4,787 |
|
2575.505 |
DISK ANCHORING (P) |
ACRE |
3.1 |
|
2575.505 |
SEEDING (P) |
ACRE |
6.1 |
|
2575.508 |
HYDRAULIC BONDED FIBER MATRIX |
LBS |
7,323 |
|
2575.508 |
SEED MIXTURE 25-121 |
LBS |
430 |
|
2575.509 |
MULCH MATERIAL, TYPE 3 |
TON |
6.1 |
|
2575.523 |
RAPID STABILIZATION METHOD 3 |
M GAL |
22.6 |
|
2580.503 |
INTERIM PAVEMENT MARKING |
LF |
1,312 |
|
2582.503 |
4" BROKEN LINE PAINT |
LF |
1,230 |
|
2582.503 |
4" SOLID LINE PAINT |
LF |
23,368 |
S.A.P. 011-679-002 |
|
2021.501 |
MOBILIZATION |
LS |
1 |
|
2051.501 |
MAINT & RESTORATION OF HAUL ROADS |
LS |
1 |
|
2118.609 |
AGGREGATE SURFACING SPECIAL |
TON |
615 |
|
2123.510 |
MOTOR GRADER |
HOUR |
5 |
|
2232.504 |
MILL BITUMINOUS SURFACE (1.5") |
SY |
16,316 |
|
2357.606 |
BITUMINOUS MATERIAL FOR SHOULDER TACK |
GAL |
306 |
|
2360.509 |
TYPE SP 9.5 WEARING COURSE MIX (2,B) |
TON |
1,890 |
|
2501.502 |
INSTALL CULVERT MARKERS |
EACH |
6 |
|
2540.602 |
MAIL BOX SUPPORT |
EACH |
14 |
|
2563.610 |
TRAFFIC CONTROL |
LS |
1 |
|
2580.503 |
INTERIM PAVEMENT MARKING |
LF |
816 |
|
2582.503 |
4" BROKEN LINE PAINT |
LF |
890 |
|
2582.503 |
4" SOLID LINE PAINT |
LF |
12,997 |