Line |
Item Number |
Description |
Units |
Quantity |
C.P. 2021-25 - Uncategorized |
|
2021.501 |
MOBILIZATION |
LS |
1 |
|
2104.502 |
REMOVE MISCELLANEOUS STRUCTURE |
EACH |
1 |
|
2105.507 |
SELECT GRANULAR BORROW MOD 10% (CV) (P) (P) |
CY |
330 |
|
2105.601 |
TEMPORARY STREAM DIVERSION SYSTEM |
LS |
1 |
|
2118.609 |
AGGREGATE SURFACING CLASS 1 MOD |
TON |
440 |
|
2401.601 |
STRUCTURE EXCAVATION |
LS |
1 |
|
2412.502 |
16X6 PRECAST CONCRETE BOX CULVERT END SECTION |
EACH |
2 |
|
2412.503 |
16X6 PRECAST CONCRETE BOX CULVERT |
LF |
50 |
|
2442.501 |
REMOVE EXISTING BRIDGE |
LS |
1 |
|
2451.507 |
GRANULAR BEDDING (CV) (P) (P) |
CY |
99 |
|
2511.504 |
GEOTEXTILE FILTER TYPE 7 |
SY |
275 |
|
2511.507 |
RANDOM RIPRAP CLASS IV |
CY |
40 |
|
2563.601 |
TRAFFIC CONTROL |
L S |
1 |
|
2573.503 |
FLOTATION SILT CURTAIN, TYPE MOVING WATER |
LF |
20 |
|
2573.503 |
SILT FENCE, TYP PA |
LF |
895 |
|
2575.501 |
TURF ESTABLISHMENT |
LS |
1 |
|
2575.504 |
EROSION CONTROL BLANKET, CATEGORY 3N |
SY |
1,317 |
|
2575.505 |
RAPID STABILIZATION METHOD 2 |
ACRE |
0.27 |
SAP 011-598-007 - Uncategorized |
|
2021.501 |
MOBILIZATION |
LS |
1 |
|
2101.501 |
CLEARING AND GRUBBING |
LS |
1 |
|
2104.503 |
REMOVE FENCE |
LF |
139 |
|
2105.507 |
SELECT GRANULAR BORROW MOD 10% (CV) |
CY |
280 |
|
2105.601 |
TEMPORARY STREAM DIVERSION SYSTEM |
LS |
1 |
|
2118.609 |
AGGREGATE SURFACING CLASS 1 MOD |
TON |
142 |
|
2401.601 |
STRUCTURE EXCAVATION |
LS |
1 |
|
2412.502 |
16X6 PRECAST CONCRETE BOX CULVERT END SECTION |
EACH |
2 |
|
2412.503 |
16X6 PRECAST CONCRETE BOX CULVERT |
LF |
40 |
|
2442.501 |
REMOVE EXISTING BRIDGE |
LS |
1 |
|
2451.507 |
GRANULAR BEDDING (CV) |
CY |
85 |
|
2511.504 |
GEOTEXTILE FILTER TYPE 7 |
SY |
205 |
|
2511.507 |
RANDOM RIPRAP CLASS III |
CY |
40 |
|
2511.507 |
RANDOM RIPRAP CLASS IV |
CY |
35 |
|
2557.603 |
BARBED WIRE FENCE |
LF |
160 |
|
2563.601 |
TRAFFIC CONTROL |
L S |
1 |
|
2573.503 |
FLOTATION SILT CURTAIN, TYPE MOVING WATER |
LF |
20 |
|
2573.503 |
SILT FENCE, TYP PA |
LF |
657 |
|
2575.501 |
TURF ESTABLISHMENT |
LS |
1 |
|
2575.504 |
EROSION CONTROL BLANKET, CATEGORY 3N |
SY |
742 |
|
2575.505 |
RAPID STABILIZATION METHOD 2 |
ACRE |
0.15 |