Project Items
Line | Item Number | Description | Units | Quantity |
---|---|---|---|---|
2021.501/00010 | MOBILIZATION | LUMP SUM | 1 | |
2355.502/00010 | BITUMINOUS MATERIAL FOR FOG SEAL | GALLON | 10,445 | |
2356.505/00010 | BITUMINOUS MATERIAL FOR SEAL COAT | GALLON | 78,353 | |
2356.506/000250 | BITUMINOUS SEAL COAT (FA 2 1/2) | SQ YD | 242,573 | |
2563.601/00010 | TRAFFIC CONTROL | LUMP SUM | 1 | |
2580.603/00010 | INTERIM PAVEMENT MARKING | LIN FT | 68,839 | |
2582.501/00019 | PAVEMENT MESSAGE (LEFT-THRU ARROW) PAINT | EACH | 2 | |
2582.501/00050 | PAVEMENT MESSAGE (RIGHT ARROW) PAINT | EACH | 2 | |
2582.502/00140 | 4" SOLID LINE WHITE-PAINT | LIN FT | 89,355 | |
2582.502/00150 | 6" SOLID LINE WHITE-PAINT | LIN FT | 200 | |
2582.502/00168 | 8" DOTTED LINE WHITE-PAINT | LIN FT | 179 | |
2582.502/00172 | 24" SOLID LINE WHITE-PAINT | LIN FT | 26 | |
2582.502/00180 | 4" SOLID LINE YELLOW-PAINT | LIN FT | 57,554 | |
2582.502/00200 | 4" BROKEN LINE YELLOW-PAINT | LIN FT | 5,125 |