Line |
Item Number |
Description |
Units |
Quantity |
Base Bid |
|
2021.501/00010 |
MOBILIZATION |
LS |
1 |
|
2101.502 |
CLEARING AND GRUBBING |
EACH |
7 |
|
2104.504/00130 |
REMOVE BITUMINOUS SURFACING |
S Y |
7,024 |
|
2106.607 |
COMMON EXCAVATION (P) |
CU YD |
1,320 |
|
2211.607 |
AGGREGATE BASE (CV) CLASS 5 (P) |
CU YD |
716 |
|
2521.618 |
5" CONCRETE WALK |
S F |
58,022 |
|
2563.601/00010 |
TRAFFIC CONTROL |
LS |
1 |
|
2573.501/00025 |
STABILIZED CONSTRUCTION EXIT |
LS |
1 |
|
2573.502/00040 |
SILT FENCE, TYPE MS |
L F |
3,830 |
|
2573.502/00110 |
STORM DRAIN INLET PROTECTION |
EACH |
5 |
|
2574.507/00104 |
BOULEVARD TOPSOIL BORROW |
C Y |
230 |
|
2575.601 |
TURF ESTABLISHMENT |
LS |
1 |
|
2575.623 |
RAPID STABILIZATION METHOD 3 |
MGAL |
13.5 |
Alternate 1 |
|
2104.504/00130 |
REMOVE BITUMINOUS SURFACING |
S Y |
1,019 |
|
2106.607 |
COMMON EXCAVATION (P) |
CU YD |
166 |
|
2211.607 |
AGGREGATE BASE (CV) CLASS 5 (P) |
CU YD |
74 |
|
2521.618 |
5" CONCRETE WALK |
S F |
6,016 |
|
2574.507/00104 |
BOULEVARD TOPSOIL BORROW |
C Y |
45 |
|
2575.623 |
RAPID STABILIZATION METHOD 3 |
MGAL |
0.5 |
Alternate 2 |
|
2104.504/00130 |
REMOVE BITUMINOUS SURFACING |
S Y |
725 |
|
2106.607 |
COMMON EXCAVATION (P) |
CU YD |
134 |
|
2211.607 |
AGGREGATE BASE (CV) CLASS 5 (P) |
CU YD |
89 |
|
2521.618 |
5" CONCRETE WALK |
S F |
7,245 |
|
2574.507/00104 |
BOULEVARD TOPSOIL BORROW |
C Y |
338 |
|
2575.623 |
RAPID STABILIZATION METHOD 3 |
MGAL |
2.5 |